For an attributes sampling plan, the tolerable deviation rate is 4%, the computed upper deviation rate is 7%, the sample deviation rate is 3%, and the risk of assessing control risk too low is 5%. Which of the following is true?
A) The auditor must increase control risk because the risk of assessing control risk too low is greater than the tolerable deviation rate.
B) The auditor is likely to increase control risk because the risk of assessing control risk too low is greater than the tolerable deviation rate.
C) The auditor must increase control risk because the computed upper deviation rate is greater than the tolerable deviation rate.
D) The auditor is likely to increase control risk because the computed upper deviation rate is greater than the tolerable deviation rate.
Correct Answer:
Verified
Q44: Your manager, Sally, believes that nonstatistical sampling
Q45: When determining the sample size of accounts
Q46: Which of the following risks is related
Q47: For a large population of cash disbursement
Q48: Which of the following risks is related
Q50: Audit sampling is commonly used for which
Q51: Why must an auditor use sampling? What
Q52: If the size of the sample to
Q53: In nonstatistical sampling for tests of controls,
Q54: To determine the sample size for a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents