Figure 7-3 System Integration Project

Question 35

Multiple Choice

  Figure 7-3 System Integration Project -Consider the System Integration Project depicted in Figure 7-3.Based on the information provided,what is the expected duration of this project?​  A)  15 days  B)  16 days  C)  17 days  D)  30 days Figure 7-3 System Integration Project
-Consider the System Integration Project depicted in Figure 7-3.Based on the information provided,what is the expected duration of this project?​ 


A)  15 days 
B)  16 days 
C)  17 days 
D)  30 days