In the enumeration method the project schedule is calculated many times (perhaps 1,000 or more),and each time,the estimate for a particular activity is generated based on the likelihood of that time as determined by the project manager.
Correct Answer:
Verified
Q4: When developing a project schedule,total float refers
Q5: The length of time to perform an
Q6: The "start-to-start" logical relationship used in activity
Q7: A mandatory dependency is a logical relationship
Q8: There is often terrific pressure to complete
Q10: If the project manager changes an activity
Q11: While the lowest level of decomposition in
Q12: A Gantt chart is a horizontal bar
Q13: In order for activities to be useful
Q14: PERT refers to Program Evaluation and Review