______ charts show the loads on various work centers,equipment,or facilities as well as the associated idle times.
A) Gantt load
B) Gantt schedule
C) Gantt sequence
D) Gantt output
Correct Answer:
Verified
Q31: The formula for calculating critical ratio is
Q32: _ is a method applied to situations
Q33: _ charts are used to monitor jobs
Q34: The job that arrived first at a
Q35: _ is the process of determining the
Q37: _ is a technique used to optimize
Q38: Critical ratio (CR)= 1 implies _.
A)the job
Q39: _ is the preferred loading approach in
Q40: _ are visual tools that can be
Q41: The job is ahead of schedule when