In the control phase of a Six Sigma project,______.
A) the senior management checks to see if the project manager is well in control of the project
B) the project team checks to see if quality improvements are sustained
C) the firm makes improvements to the process
D) the manager ensures the problem is well defined
Correct Answer:
Verified
Q59: The Malcolm Baldrige National Quality Award _.
A)was
Q60: ISO certification _.
A)is a one-time activity; that
Q61: Which of the following statements does NOT
Q62: Six Sigma projects have _.
A)specific operational targets
B)specific
Q63: The tool that monitors outputs from a
Q65: During the analyze phase of Six Sigma,the
Q66: Two models that firms can use to
Q67: During the measure phase of Six Sigma,the
Q68: The DMADV methodology is applied _.
A)when we
Q69: Process capability is the extent to which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents