Causing a delay to the whole project is called
A) acquired float.
B) total float.
C) accumulated float.
D) negative float.
Correct Answer:
Verified
Q39: Boeing used FastTrack for scheduling,tracking,and resource allocation
Q40: Which of the following demands extensive hardware,is
Q41: Advantages of PERT include
A)inexpensive to maintain.
B)flexibility.
C)easy to
Q42: For an activity,assume the early start is
Q43: PDM is useful because it provides
A)the start
Q45: Which of the following is the longest
Q46: Negative slack can occur due to
A)unavailability of
Q47: For an activity,assume the early start is
Q48: Causing a delay to a subsequent activity
Q49: Which of the following is used in