In a _____ environment,there is some latitude concerning what is to be done and when it is scheduled.
A) make-to-order
B) assemble-to-order
C) design for assembly
D) make-to-stock
Correct Answer:
Verified
Q69: MRP record processing proceeds from one level
Q70: MRP cannot be used without the appropriate
Q71: The matrix _ is a special chart
Q72: The first step in the planning hierarchy
Q73: DRP1 can be defined as
A)determining the needs
Q75: _ is a higher order planning system
Q76: _ uses the principle that the lowest
Q77: _ are the starting point for actual
Q78: _ is among the simplest ordering methods,but
Q79: Gross requirements less the projected stock-on-hand,at time