The deliverables from the coding, testing, and installation processes include:
A) the creation of a document that will consolidate the information that must be considered when implementing a physically distributed systems design.
B) structured descriptions and diagrams that outline the logic contained within each DFD process.
C) the code, program documentation, test scenarios and test data, results of program and system testing, user guides, user training plan, and an installation and conversion plan.
D) all of the above.
E) none of the above.
Correct Answer:
Verified
Q41: Post-project reviews are part of the system
Q44: All user training must be done as
Q46: The extent to which a system is
Q49: Baseline routines are guidelines that list the
Q50: Reverse engineering and reengineering tools are primarily
Q55: A primary objective of using automated tools
Q56: Preventive maintenance requires the least maintenance effort.
Q57: Training and support are not critical for
Q69: The bringing together of all the programs
Q76: The most complete acceptance testing will include:
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents