The measurement is made in square metre in case of
A) cement concrete in foundation
B) r.c.c. structure
C) hollow concrete block wall
D) none of these
Correct Answer:
Verified
Q12: Pick up the correct statement from the
Q13: The cross-sections for a highway is taken
Q14: Referring of given figure, pick up the
Q15: According to Indian Standards Institute, the actual
Q16: The following item of earth work is
Q18: Cost of fittings and their fixing is
Q19: The excavation exceeding 1.5 m in width
Q20: For the construction of buildings, the subheads
Q21: Pick up the correct statement from the
Q22: The cross-section of a road partly