What is the first step a project team should consider when trying to save energy?
A) Use on-site renewable energy
B) Reduce energy demand
C) Adopt energy efficiency measures
D) Install submetering equipment
Correct Answer:
Verified
Q19: Wind turbines, as a renewable energy source,
Q20: Project sites in _ altitudes can generate
Q21: The standard increment of electricity is the:
A)Kilowatt-hour
B)Kilowatt-minute
C)Kilometer-hour
D)Kilometer-minute
Q22: The levels of ongoing energy performance established
Q23: Strategies for ongoing energy performance include all
Q25: Equipment types that use British Thermal Units
Q26: Chillers are devices that remove heat from
Q27: A compact fluorescent lamp (CFL) is a
Q28: Greenhouse gas emissions per capita is a
Q29: To qualify for the Energy Start Rating,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents