When a CR high pressure line is removed for any reason, which of the following steps is required practice by many engine OEMs?
A) remove and replace the line nuts
B) torque the line nuts to spec
C) dress the sealing nipples on a grinder
D) replace the high pressure line
Correct Answer:
Verified
Q22: How many pump cylinders are used in
Q23: Technician A says that most Bosch CR
Q24: If actual rail pressure falls below desired
Q25: If the rail pressure limiter valve trips
Q26: What is the function of the quill
Q28: Which of the following is another way
Q29: When a typical CR-EHI is energized by
Q30: Technician A says that CR EHIs with
Q31: What term is used by Caterpillar on
Q32: Technician A says that an EHI with
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents