Once stakeholders agree that random assignment to groups will be permitted, it is crucial that
A) the evaluator periodically monitor the outcome variables.
B) stakeholders be permitted to make the actual group assignments.
C) different rates of attrition among groups not be permitted to introduce bias.
D) regression to the mean be carefully examined.
Correct Answer:
Verified
Q10: When determining the costs of a valid,
Q11: An evaluation that _ is a waste
Q12: Usually a new program cannot be implemented
Q13: One can expect the most objections to
Q14: When an ambitious program evaluation of a
Q16: Diffusion or imitation of the program by
Q17: Attempts to compensate the control group tends
Q18: When control groups feel rivalry with the
Q19: If a control group experiences resentful demoralization
Q20: When an outcome evaluation is designed as
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents