Which of the following is true regarding Gantt chart construction?
A) To construct the Gantt chart,a horizontal bar is drawn for each activity that reflects its sequence and duration.
B) To show precedence relationships,arrows are used to connect actions.
C) Arrows are used to reflect the sequence of activities.
D) Squares are used to represent activities.
Correct Answer:
Verified
Q110: In OOSAD,iterations are normally:
A)five weeks
B)ten weeks
C)eleven weeks
D)two
Q111: What would be the estimated time for
Q112: A critical path is:
A)a sequence of activities
Q113: Optimistic time is:
A)the maximum period of time
Q114: Pessimistic time is:
A)the maximum period of time
Q116: Automated tools available to help you manage
Q117: A _ is a systems analyst with
Q118: In OOSAD,the project manager must:
A)subdivide the whole
Q119: A characteristic of the OOSAD approach is:
A)that
Q120: A _ is a planned undertaking of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents