Solved

A Technician Is Installing a New Server with Redundant Power

Question 526

Multiple Choice

A technician is installing a new server with redundant power supplies in an ISO-certified datacenter. Which of the following should the technician perform?


A) Determine the maximum power load
B) Connect each power supply to separate power circuits
C) Connect each power supply to the UPS
D) Run a drop cord from an unused outlet and attach the power cords

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents