A network manager notices several outages have occurred due to modifications that were made without being properly tested. Which of the following will the network manager MOST likely implement to prevent future occurrences?
A) Logical diagram
B) Change management
C) IDF documentation
D) Configuration baseline
Correct Answer:
Verified
Q636: Management is concerned there is excessive traffic
Q637: A company's server-naming convention is overly complicated.
Q638: Which of the following protocols is used
Q639: After deployment of a second network link
Q640: The engineering department wants to bring a
Q642: A network engineer has connected the storefront
Q643: Which of the following types of packets
Q644: A user wants to secure a network
Q645: A manufacturing company has signed an agreement
Q646: A network analyst is providing access to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents