You are designing a large-scale DMVPN network with more than 500 spokes using EIGRP as the IGP protocol. Which design option eliminates potential tunnel down events on the spoke routers due to the holding time expiration?
A) Increase the hold queue on the tunnel interface of the spoke routers.
B) Increase the hold queue on the physical interface of the spoke routers.
C) Increase the hold queue on the physical interface of the hub router.
D) Increase the hold queue on the tunnel interface of the hub router.
E) Apply QoS for pak_priority class.
Correct Answer:
Verified
Q123: What should be taken into consideration when
Q124: Which option is a benefit of using
Q125: Company A has grown nationwide in the
Q126: Two medium-sized companies recently merged and would
Q127: Refer to the exhibit. Q129: Refer to the exhibit. Q130: There is an MPLS-enabled link constantly flapping Q131: Your company will attach to a new Q132: Refer to the exhibit. Q133: Refer to the exhibit. In the DWDM Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents