An engineer configures a new Cisco ACI Multi-Pod and must set up the link between the spine and the IPN device. Which three actions should be taken to accomplish this goal? (Choose three.)


A) Enable MP-BGP routing
B) Enable BIDIR-PIM protocol
C) Enable PIM-SM protocol
D) Enable OSPF routing
E) Enable IS-IS routing
F) Enable DHCP relay