Solved

Refer to the Exhibit

Question 73

Multiple Choice

  Refer to the exhibit. Partial configuration from N9K-1 and N9K-2 is included. The client has two WANs connected. WAN-1 is for normal business-day activities. WAN-2 is for server backups during nonworking hours of 1:00 a.m. to 5:00 a.m. daily. The client says that at the scheduled time for backup, the data center server failed to use the WAN-2 link to back up the servers to the cloud backup system. What is the solution to this problem? A)  The event timer must be written in epoch time format. B)  The Cisco Nexus switch must be configured with one applet because a configuration with two applets will fail. C)  The Cron entry must be configured without double quotes. D)  The applet called  Backup  must include an action to remove the current static route. Refer to the exhibit. Partial configuration from N9K-1 and N9K-2 is included. The client has two WANs connected. WAN-1 is for normal business-day activities. WAN-2 is for server backups during nonworking hours of 1:00 a.m. to 5:00 a.m. daily. The client says that at the scheduled time for backup, the data center server failed to use the WAN-2 link to back up the servers to the cloud backup system. What is the solution to this problem?


A) The event timer must be written in epoch time format.
B) The Cisco Nexus switch must be configured with one applet because a configuration with two applets will fail.
C) The Cron entry must be configured without double quotes.
D) The applet called "Backup" must include an action to remove the current static route.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents