Consider the following process flow: What is the problem with this flow?
A) There is nothing wrong with this flow.
B) The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
C) The Attach Block should be enlarged to also include the 'Waited Long Enough?' decision stage.
D) The flow contains a recover stage and a route from it without a resume stage. This will cause internal error on future exceptions thrown in the same session.
E) The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
Correct Answer:
Verified
Q53: When considering an element's attributes in Application
Q54: You identify an element in Application Modeller
Q55: What is the Blue Prism Application Navigator?
A)
Q56: Examine the following process flow:
Q57: The Work Queue "Customer Onboarding" has a
Q59: Which of the following indicates a case
Q60: When building a solution to use Tags
Q61: How can an environment variable value be
Q62: A Blue Prism solution interfaces with an
Q63: Study the following diagram which is an
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents