______________ to be established to judge acceptability of risk could he an objective of the RBI assessment if such criteria do not exist already within the user's company.
A) Risk criteria
B) Risk plan
C) Risk analysis
Correct Answer:
Verified
Q7: _ are the primary inputs into the
Q8: _ may result in the calculated corrosion
Q9: Who should be consulted to define the
Q10: Is key to performing deterioration mechanism identification
A)
Q11: Loss of containment is
A) Loss of fluid
Q13: When the inspection program is optimized based
Q14: Generally, a qualitative analysis using broad ranges
Q15: The following are the risks identified by
Q16: Equipment reliability is especially important if leaks
Q17: The amount and type of codes and