An approved LOTO procedure should be completed before inspecting power cable terminals in generator junction boxes.
Correct Answer:
Verified
Q5: Dimension "B" input for the LASER alignment
Q6: The LASER stationary head should be mounted
Q7: Never look directly at the LASER transmitter
Q8: Visual indications a generator may be operating
Q9: Generator misalignment may be seen during a
Q10: Generic alignment steps include mounting the LASER
Q12: Wind turbine generators are classified as either
Q13: Electrical maintenance activities for a generator may
Q14: All wind trubine manufaturers use forced air
Q15: Documentation on PM checklists typically include part