Deduct for openings in the concrete that are less than one cubic foot (0.05 cubic meters)of volume.
Correct Answer:
Verified
Q10: Welded wire mesh shall be measured in
Q11: Expansion joints are measured in _, stating
Q12: Linear inserts such as waterstops are measured
Q13: Finishes are first classified in terms of
Q14: Because only the _ of formwork is
Q16: Preparing a quantity takeoff of concrete work
Q17: Saw cuts for concrete are measured in
Q18: Concrete shall be measured in _ net
Q19: Because the concrete is detailed on the
Q20: Bulkhead forms are measured to the perimeter
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents