"Bank measure" amounts are obtained by using the dimensions of the holes excavated or filled with no adjustment made to the quantities obtained for swell or compaction of materials.
Correct Answer:
Verified
Q1: In general, items of excavation, backfill, and
Q3: Before the estimator can measure the site
Q4: Bearing piles are classified as all of
Q5: The soil that is extracted from an
Q6: The difference between the volume of the
Q7: The purpose of the _ is to
Q8: In accordance with the general principle of
Q9: Bearing piles are measured in linear feet
Q10: Contractors are usually advised in the "_"
Q11: Measuring sitework and excavation work is the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents