The ____ line is the point below the surface to which the ground usually freezes in winter.
A) plumb
B) frost
C) water
D) boundary
Correct Answer:
Verified
Q6: Any water used to make concrete should
Q7: All-weather wood foundations are made of pressure-treated
Q8: _ are doubled 2 *4 pieces with
Q9: Precast concrete foundations sections are set by
Q10: The purpose of a(n) _ is to
Q12: Form boards need to be accurately cut
Q13: _ is a mixture of Portland cement,
Q14: Slump tests are done to determine the
Q15: Concrete has high compressive strength.
Q16: A combined slab and foundation / footing