Most likely time generally is at least as long as optimistic time.
Correct Answer:
Verified
Q26: The standard deviation of the critical path
Q27: If two consecutive activities have shared slack,
Q28: Deterministic networks use three time estimates-shortest, most
Q29: Slack time is equal to LS-ES or
Q30: The total cost of crashing any one
Q32: Activities not on the critical path have
Q33: In order to determine the probability of
Q34: In the execution phase of a project's
Q35: The probability that the project will go
Q36: Which of the following is not one
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents