As part of a time study, a particular job was analyzed. The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: Assuming an allowance factor of 15%, the standard time for this job would be
A) 4.35 minutes.
B) 3.67 minutes.
C) 2.712 minutes.
D) 2.358 minutes.
Correct Answer:
Verified
Q1: In a time study the standard time
Q6: How many cycles should be used in
Q6: The allowance factor is a percentage increase
Q7: As part of its quality-improvement program, a
Q7: Workers often do not like to be
Q8: Rating the worker's performance is typically an
Q8: Under normal circumstances and conditions,the time required
Q10: Work sampling is an easier, cheaper, and
Q11: A time study is a statistical sample
Q17: Determining the length of time it takes
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks