Progress and performance can be measured quantitatively as well as qualitatively.
Correct Answer:
Verified
Q6: In calculating schedule variance and cost variance,
Q7: The PV, AC and CV are all
Q8: A project manager notices that the current
Q9: A CPI index of 1.11 indicates that
Q10: Baseline costs typically include labor, equipment, materials
Q12: Most changes will not result in serious
Q13: Schedule variance measures progress in time units.
Q14: The best method for assigning costs to
Q15: In some cases, conditions or scope can
Q16: An undesirable schedule variance always indicates that