Develop a solution for the following line balancing problem, allowing a cycle time of 5 minutes.
(a) Draw the precedence diagram for the set of tasks.
(b) Calculate the theoretical minimum number of workstations.
(c) Balance this line using the longest task time heuristic.
(d) What tasks are assigned to which stations?
(e) Does the solution have the minimum number of stations? Explain.
(f) How much idle time is there, summed over all workstations?
(g) What is the efficiency of this line?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q309: You have been asked to balance a
Q310: Identify the five common layout heuristics used
Q311: A company is trying to balance production
Q312: An assembly line with 11 tasks is
Q313: A firm operates a flow shop building
Q315: Identify the formulas for the following terms
Q316: Hemo-tech, Inc., a biomedical technology and research
Q317: A(n) _ line is a machine-paced product-oriented
Q318: A firm is planning to set up
Q319: What are the advantages and disadvantages of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents