Solved

Timing the Work Elements Using the Snap-Back Method Requires

Question 15

Multiple Choice
Timing the work elements using the snap-back method requires:
A) the worker to perform each job element as quickly as possible.
B) a larger sample size than using the continuous method.
C) the use of two stopwatches.
D) a smaller sample size than using the continuous method.

Timing the work elements using the snap-back method requires:


A) the worker to perform each job element as quickly as possible.
B) a larger sample size than using the continuous method.
C) the use of two stopwatches.
D) a smaller sample size than using the continuous method.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents