In setting up a Kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?
A) 60
B) 80
C) 90
D) 120
E) 150
Correct Answer:
Verified
Q75: Group technology (GT) is credited with which
Q76: Which of the following is a lean
Q77: Which of the following address elimination of
Q78: In the textbook, Toyota's Tai-ichi Ohno identified
Q79: You have been called in as a
Q81: In a Kanban card calculation problem, other
Q82: Consider the relationship between optimal lot size
Q83: Which of the following is not listed
Q84: You have been called in as a
Q85: Which of the following is a lean
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents