Assume You Are Sequencing Jobs Using Johnson's Rule

Question 115

Multiple Choice

Assume you are sequencing jobs using Johnson's rule. There are three jobs called A, B, and C. The first step is assembling and the second step is painting. Job A requires 3 hours to assemble and 6 hours to paint. Job B requires 7 hours to assemble and 2 hours to paint. Job C requires 4 hours to assemble and 1 hour to paint. The objective is to minimize the total processing time of all jobs, using Johnson's rule. What is the correct sequence to process the jobs?


A) A-C-B
B) B-C-A
C) B-A-C
D) A-B-C
E) C-B-A