When work is scheduled in detail using the setup and run time required for each order, then theoretically all schedules will be feasible.
Correct Answer:
Verified
Q25: Mr. Goldratt's "theory of constraints" is useful
Q26: According to the theory of constraints, capacity
Q27: According to the theory of constraints, the
Q28: OPT stands for optimal purchasing technique.
Q29: MES and SES are acronyms for "manufacturing
Q31: Most scheduling systems develop their schedules without
Q32: Operations scheduling is at the heart of
Q33: According to the theory of constraints, a
Q34: Scheduling hourly work times using the "first-hour
Q35: Synchronous manufacturing refers to the entire production