One of the principles of workcenter scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
Correct Answer:
Verified
Q31: Most scheduling systems develop their schedules without
Q32: Operations scheduling is at the heart of
Q33: According to the theory of constraints, a
Q34: Scheduling hourly work times using the "first-hour
Q35: Synchronous manufacturing refers to the entire production
Q37: According to the theory of constraints, it
Q38: Dr. Eli Goldratt feels that the goal
Q39: According to the theory of constraints, a
Q40: The operational measure of throughput is "the
Q41: On an assembly line, a process batch
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents