Lean thinking with a firm's suppliers involves all of the following except?
A) Delivery of smaller quantities
B) More frequent deliveries
C) Earlier deliveries
D) Delivery to point of use
Correct Answer:
Verified
Q21: SMED was first developed and used at
Q22: Lean systems are also known as?
A) Push
Q23: Which of the following is sometimes considered
Q24: What is used to signal a need
Q25: Consider a work center with a demand
Q27: A kanban that is used to authorize
Q28: All of the following are the steps
Q29: Consider a work center with a demand
Q30: Lean production tends to?
A) Rely on less
Q31: Setups that are performed before a machine
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents