Use Inequalities to Describe Limitations in a Situation
-A steel company produces two types of machine dies, part A and part B and is bound by the following constraints:
- Part A requires 1 hour of casting time and 10 hours of firing time.
- Part B requires 4 hours of casting time and 3 hours of firing time.
- The maximum number of hours per week available for casting and firing are 100 and 70 , respectively.
- The cost to the company is per part and per part . Total weekly costs cannot exceed .
Let the number of part A produced in a week and the number of part B produced in a week. Write a system of three inequalities that describes these constraints.
A)
B)
C)
D)
Correct Answer:
Verified
Q254: Graph the solution set of the
Q255: Graph the solution set of the
Q256: Graph the solution set of the
Q257: Graph the solution set of the
Q258: Graph the solution set of the system
Q260: Graph the solution set of the
Q261: Use Linear Programming to Solve Problems
-Objective
Q262: Use Linear Programming to Solve Problems
-Two
Q263: Use Inequalities to Describe Limitations in
Q264: Use Linear Programming to Solve Problems
-A
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents