According to the theory of constraints (TOC), the drum in the drum- buffer- rope method refers to the bottleneck of the process.
Correct Answer:
Verified
Q59: What factors should be considered when selecting
Q132: Setup time is the time required to
Q133: Identify the three interrelated factors that implicitly
Q134: Explain the relationship between throughput time and
Q135: The base case concept is to do
Q136: What is the capacity cushion and how
Q138: Aggregate stock is any stock of items
Q139: Explain the distinction between blocked and starved
Q140: Larry's Wickets, Inc. is producing two types
Q141: Explain the distinction between input and output
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents