In normal costing overhead is allocated using the estimated allocation rate multiplied by the actual quantity of allocation base.
Correct Answer:
Verified
Q32: The assignment of overhead to individual jobs
Q33: Over applied overhead is always material and
Q34: The overhead control account records the actual
Q35: The cost pools used in process costing
Q36: In both actual and normal costing the
Q38: If the amount of over or under
Q39: The accounting method for assigning production costs
Q40: Under applied overhead occurs when actual costs
Q41: FIFO assumes that the units in beginning
Q42: The weighted average method isolates efficiencies or