What is an auditor's evaluation of a statistical sample for attributes when a test of 100 documents results in four deviations if the tolerable deviation rate is 5%, the expected population deviation rate is 3% and the allowance for sampling risk is 2%?
A) Modify planned reliance on the control because the tolerable rate plus the allowance for sampling risk exceeds the expected population deviation rate.
B) Accept the sample results as support for planned reliance on the control because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable rate
C) Accept the sample results as support for planned reliance on the control because the tolerable rate less the allowance or sampling risk equals the expected population deviation rate
D) Modify planned reliance on the control because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable rate.
Correct Answer:
Verified
Q25: The initial sample size is so- called
Q26: If the auditor decides to assess control
Q27: An increase in the sample size has
Q28: If the size of the sample to
Q29: A frequency distribution of the results of
Q31: Difference estimation, ratio estimation and mean- per-
Q32: Sampling risk (sampling error) is an inherent
Q33: A statistical method used to estimate the
Q34: The allowable risk of overreliance (ARO) has
Q35: A most important part of audit sampling
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents