Builder and owner enter into a contract to have a building built. At the time they entered into the contract they were unaware that there was an underground stream below the site that would make the construction impossible. The contract has been discharged due to frustration.
Correct Answer:
Verified
Q23: Where a mistake is made in a
Q24: Rectification is where a written contract is
Q25: A plea of non est factum cannot
Q26: Frustrating events are the same as mistakes.
Q30: Mistake takes place after the formation of
Q31: Where a contract involves a level of
Q33: If at the time of entering into
Q44: The most fundamental mistake that radically changes
Q46: Where the wrong words are inadvertently used
Q58: A legal mistake is an error in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents