The short-term scheduling activity called loading
A) assigns dates to specific jobs or operations steps.
B) specifies the order in which jobs should be done at each centre.
C) assigns jobs to work centres.
D) assigns workers to jobs.
E) assigns workers to machines.
Correct Answer:
Verified
Q4: Which of the following is not an
Q37: Which file contains important information regarding an
Q38: Because of the significance of labour in
Q40: The jobs listed below needed to
Q41: The production database containing information about each
Q43: Three jobs are to be assigned
Q44: A work centre is interested in limiting
Q46: The assignment method is
A) a method to
Q51: A scheduling technique used to achieve optimum,
Q55: Using LPT priority would result in what