Since work packages provide the basis for future project planning activities,they should be as detailed as possible.
Correct Answer:
Verified
Q1: Failure to include project management in the
Q2: Organizing the second level of the Work
Q3: When a project team needs to construct
Q4: It is important to assign a unique
Q6: A deliverable is a condition or capability
Q7: The project scope refers to the features
Q8: The project scope is the work that
Q9: If a problem occurs during project execution,the
Q10: The project scope statement establishes the project
Q11: A Work Breakdown Structure must be decomposed