The first step in project selection is to
A) develop a set of criteria against which a project will be evaluated.
B) gather data and information for each project.
C) list assumptions.
D) evaluate each project against the criteria.
Correct Answer:
Verified
Q44: A project charter summarizes
A) the project objective.
B)
Q45: The RFP should state the required schedule
Q46: An RFP might state the payment terms
Q47: The implementation of the new procedure is
Q48: Some RFPs mention the type of contract
Q50: The project acceptance criteria should
A) summarize the
Q51: It is fair to meet with potential
Q52: The project objective should
A) summarize the need
Q53: The RFP should provide instructions for the
Q54: A contract might be for time and