Resource constraints are represented in the network diagram by
A) drawing the activities with common resources in a loop format.
B) drawing the activities to reflect the availability of a limited quantity of resources.
C) drawing the activities with different resources in a serial relationship.
D) drawing the activities with a common finish date.
Correct Answer:
Verified
Q30: _ is an iterative method in which
Q31: When planning a project, it is necessary
Q32: Resources are not usually hired on a
Q33: Resource utilization charts based on each activity's
Q34: The resource requirements plan illustrates
A) the utilization
Q36: Resource requirements graphs based on an as-soon-as-possible
Q37: Technical constraints for a project are represented
Q38: Resource utilization charts based on each activity's
Q39: Activities in a network diagram are drawn
Q40: Which of the following is likely not
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents