The design of the system's processes is completed during the ____ phase of the SDLC.
A) planning
B) analysis
C) detailed systems design
D) implementation
Correct Answer:
Verified
Q43: Installing the DBMS,creating the database,and loading or
Q44: Testing,fine-tuning,and evaluating the database and its applications
Q45: The conceptual design step that determines end-user
Q46: The implementation and loading phase of the
Q47: "Should the existing system be replaced?" is
Q49: Analyzing the company situation is part of
Q50: The logical systems design is created during
Q51: The conceptual design step that defines entities,attributes,and
Q52: Producing the required information flow is part
Q53: The database is loaded during the _
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents