A Methods and Measurements Analyst for Timepiece,Inc.needs to develop a time standard for the task of attaching a watch to a wristband.In a preliminary study,he observed one of his employees perform this task five times,with the following results: What is the standard time (ST) for this task if the employee worked at a twenty percent faster pace than the average,and an allowance of twenty percent of the workday is used?
A) 20 seconds
B) 24 seconds
C) 25 seconds
D) 28.8 seconds
E) 30 seconds
Correct Answer:
Verified
Q112: A Methods and Measurements Analyst needs to
Q113: A Methods and Measurements Analyst needs to
Q114: A Methods and Measurement Analyst wants to
Q115: The owner of Kat Motel wants to
Q116: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q118: The owner of Kat Motel wants to
Q119: The owner of Kat Motel wants to
Q120: A Methods and Measurement Analyst wants to
Q121: 11eab92b_c497_db25_99e6_e51aa0167b03 If the person observed worked at
Q122: 11eab92b_c497_b414_99e6_cfc131dec744 If the person observed worked at
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents