The output of a process may not conform to design specifications even though the process may be statistically "in control".
Correct Answer:
Verified
Q18: A p-chart is used to monitor the
Q37: Control charts based on attribute data are
Q38: A sample statistic that falls outside the
Q40: A c-chart is used to monitor the
Q41: The purpose of control charts is to:
A)estimate
Q43: A process is "capable" if the process
Q44: Six sigma quality refers to achieving process
Q45: Control limits are statistical limits that reflect
Q46: There is no direct link between design
Q47: In order for a process to be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents