Deck 13: System Implementation

ملء الشاشة (f)
exit full mode
سؤال
Some programming languages include utilities to generate documentation automatically,while others require more effort on the part of the coder to establish good documentation.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
During the early stages of ________,the training plans are finalized and training on the use of the system begins.

A)Implementation
B)Analysis
C)Design
D)Planning
سؤال
What are the four types of maintenance?
سؤال
The data conversion plan is the deliverable that is produced after the ________ phase.

A)Coding
B)Training
C)Documentation
D)Installation
سؤال
Results of program and system testing is the deliverable that is produced after the ________ phase.

A)Testing
B)Coding
C)Support
D)Documentation
سؤال
Classes are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
The user training plan is the deliverable that is produced after the ________ phase.

A)Training
B)Support
C)Documentation
D)Installation
سؤال
Regardless of the development methodology followed,once coding has begun,the testing process can begin and proceed in parallel.
سؤال
________ involves determining what needs to be tested and collecting test data.

A)Planning
B)Analysis
C)Design
D)Testing
سؤال
The site and facility remodeling plan is the deliverable that is produced after the________ phase.

A)Documentation
B)Training
C)Installation
D)Support
سؤال
________ is the process during which the current system is replaced by the new system.

A)Testing
B)Analysis
C)Planning
D)Installation
سؤال
There are ________ major activities involved in system implementation.

A)Three
B)Four
C)Five
D)Six
سؤال
Support includes conversion of existing data,software,documentation,and work procedures to those consistent with the new system.
سؤال
Test scenarios (test plan)and test data are the deliverables that are produced after the ________ phase.

A)Testing
B)Training
C)Support
D)Documentation
سؤال
Program documentation is the deliverable that is produced after the ________ phase.

A)Testing
B)Coding
C)Installation
D)Support
سؤال
List the six major activities in system implementation.
سؤال
System documentation is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
The user guide is the deliverable that is produced after the ________ phase.

A)Training
B)Support
C)Installation
D)Documentation
سؤال
________ is the process whereby the physical design specifications created by the analysis team are turned into working computer code by the programming team.

A)Testing
B)Coding
C)Training
D)Installation
سؤال
Code is the deliverable that is produced after the ________ phase.

A)Testing
B)Coding
C)Support
D)Installation
سؤال
In a Master Test Plan,resulting test materials fall under which category?

A)Testing Requirements
B)Overall Plan
C)Procedure Control
D)Component-Specific Test Plans
سؤال
In a Master Test Plan,test initiation falls under which category?

A)Introduction
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
سؤال
In a Master Test Plan,hardware falls under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
سؤال
In a Master Test Plan,description of system to be tested falls under which category?

A)Introduction
B)Overall Plan
C)Testing Requirements
D)Component-Specific Test Plans
سؤال
Help desk is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
In a Master Test Plan,software and personnel fall under which category?

A)Introduction
B)Testing Requirements
C)Overall Plan
D)Component-Specific Test Plans
سؤال
In a Master Test Plan,milestones,schedules,and locations fall under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Introduction
سؤال
In a Master Test Plan,criteria for passing tests and software description fall under which category?

A)Procedure Control
B)Overall Plan
C)Testing Requirements
D)Component-Specific Test Plans
سؤال
Online help is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
In a Master Test Plan,document control falls under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
سؤال
Training materials are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
Computer-based training aids are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
In a Master Test Plan,test materials fall under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
سؤال
In a Master Test Plan,test execution and test failure fall under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
سؤال
Inspection is a(n)________ technique in which participants examine program code for predictable language-specific errors.

A)Training
B)Testing
C)Support
D)Installation
سؤال
Bulletin boards and other support mechanisms are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)Documentation
B)User Training Modules
C)User Training Plan
D)User Support Plan
سؤال
Tutorials are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
In a Master Test Plan,method and attachments fall under which category?

A)Procedure Control
B)Overall Plan
C)Testing Requirements
D)Component-Specific Test Plans
سؤال
________ is a testing technique in which the program code is sequentially executed manually by the reviewer.

A)Unit testing
B)Integration testing
C)Desk checking
D)Stub testing
سؤال
User documentation is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
سؤال
Testing managers are responsible for developing test plans,establishing testing standards,integrating testing and development activities in the life cycle,and ensuring that test plans are completed.
سؤال
During design,we develop a unit test plan,an integration test plan,and a system test plan and during support,these various plans are put into effect and the actual testing is performed.
سؤال
To verify that a system meets its objectives,________ testing involves using non-live test data in a non-live testing environment.

A)Unit
B)System
C)Integration
D)Stub
سؤال
________ testing sometimes is also called module testing.

A)Unit
B)System
C)Integration
D)Stub
سؤال
Which installation tries out a new information system at one site and uses the experience to decide if and how the new system should be deployed throughout the organization?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
سؤال
________ is an automated testing environment used to review code for errors,standards violations,and other design flaws.

A)Refactoring
B)Acceptance testing
C)Beta testing
D)A testing harness
سؤال
Which installation changes from the old information system to the new one incrementally,starting with one or a few functional components and then gradually extends the installation to cover the whole new system?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
سؤال
________ is defined as the process of making a program simpler after adding a new feature.

A)Refactoring
B)Testing harness
C)Desk checking
D)Beta testing
سؤال
In ________ testing,each module is tested alone in an attempt to discover any errors in its code.

A)Unit
B)Stub
C)Integration
D)System
سؤال
________ testing is a technique used in testing modules,especially where modules are written and tested in a top-down fashion,where a few lines of code are used to substitute for subordinate modules.

A)Unit
B)Stub
C)System
D)Integration
سؤال
________ is the process whereby actual users test a completed information system.

A)Refactoring
B)Beta testing
C)Alpha testing
D)Acceptance testing
سؤال
Which installation is also known as pilot installation?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
سؤال
________ testing is defined as the process of bringing together all of the modules that a program comprises for testing purposes.

A)Unit
B)Stub
C)Integration
D)System
سؤال
________ testing is defined as the process of bringing together all of the programs that a system comprises for testing purposes.

A)Unit
B)Integration
C)Stub
D)System
سؤال
________ is the user testing of a completed information system using real data in the real user environment.

A)Testing harness
B)Beta testing
C)Alpha testing
D)Acceptance testing
سؤال
________ is more than simply expanded integration testing,where you are testing the interfaces between programs in a system rather than testing the interfaces between modules in a program.

A)Unit testing
B)Stud testing
C)System testing
D)Desk checking
سؤال
Inspections are formal group activities where participants manually examine code for occurrences of well-known errors.
سؤال
Which installation runs the old information system and the new one at the same time until management decides the old system can be turned off?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
سؤال
Which installation is also known as staged installation?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
سؤال
________ is the user testing of a completed information system using simulated data.

A)Testing harness
B)Beta testing
C)Alpha testing
D)Acceptance testing
سؤال
The people who create the test cases can be the same people as those who coded and tested the system.
سؤال
________ has written or other visual information about an application system,how it works,and how to use it.

A)An installation document
B)A design document
C)User documentation
D)System documentation
سؤال
Desk checking is the process of bringing together all of the modules that a program comprises for testing purposes.
سؤال
Explain the four types of installation.
سؤال
________ has detailed information about a system's design specifications,its internal workings,and its functionality.

A)An installation document
B)A design document
C)User documentation
D)System documentation
سؤال
Different forms of refactoring include simplifying complex statements,abstracting solutions from reusable code,and removing duplicate code.
سؤال
A help desk is a single point of contact for all user inquiries and problems about a particular information system or for all users in a particular department.
سؤال
Non-live means that the data and situation are artificial,developed specifically for testing purposes,although both the data and the environment are similar to what users would encounter in everyday system use.
سؤال
The purpose of regression testing is for users to determine whether the system meets their requirements.
سؤال
Support means providing ongoing educational and problem-solving assistance to information system users.For in-house developed systems,support materials and jobs will have to be prepared or designed as part of the implementation process.
سؤال
The intent of the alpha test is to determine whether the software,documentation,technical support,and training activities work as intended.In essence,alpha testing can be viewed as a rehearsal of the installation phase.
سؤال
Under both integration and stub testing,not only do individual modules and programs get tested many times,so do the interfaces between modules and programs.
سؤال
System testing is more than simply expanded integration testing where you are testing the interfaces between programs in a system rather than testing the interfaces between modules in a program.
سؤال
In many situations,a testing harness will greatly enhance the testing process because it can automatically expand the scope of the tests beyond the current development platform as well as be run every time there is a new version of the software.
سؤال
What types of tests are performed during alpha testing?
سؤال
Define the way tests are organized according to Mosley.Provide the definition of each category.
سؤال
System documentation is written or other visual information about an application system,how it works,and how to use it.
سؤال
Which implementation factor describes characteristics of the user,such as age and degree of computer experience in an information system?

A)Satisfaction
B)User demographics
C)Performance
D)Users personal stake
سؤال
In alpha testing,the entire system is implemented in a test environment to discover whether the system is overtly destructive to itself or to the rest of the environment.
سؤال
In direct installation any errors resulting from the new system will have a direct impact on the users and how they do their jobs and,in some cases-depending on the centrality of the system to the organization-on how the organization performs its business.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/95
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: System Implementation
1
Some programming languages include utilities to generate documentation automatically,while others require more effort on the part of the coder to establish good documentation.
True
2
During the early stages of ________,the training plans are finalized and training on the use of the system begins.

A)Implementation
B)Analysis
C)Design
D)Planning
A
3
What are the four types of maintenance?
Corrective,adaptive,perfective,and preventive
4
The data conversion plan is the deliverable that is produced after the ________ phase.

A)Coding
B)Training
C)Documentation
D)Installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
5
Results of program and system testing is the deliverable that is produced after the ________ phase.

A)Testing
B)Coding
C)Support
D)Documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
6
Classes are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
7
The user training plan is the deliverable that is produced after the ________ phase.

A)Training
B)Support
C)Documentation
D)Installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
8
Regardless of the development methodology followed,once coding has begun,the testing process can begin and proceed in parallel.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
9
________ involves determining what needs to be tested and collecting test data.

A)Planning
B)Analysis
C)Design
D)Testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
10
The site and facility remodeling plan is the deliverable that is produced after the________ phase.

A)Documentation
B)Training
C)Installation
D)Support
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
11
________ is the process during which the current system is replaced by the new system.

A)Testing
B)Analysis
C)Planning
D)Installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
12
There are ________ major activities involved in system implementation.

A)Three
B)Four
C)Five
D)Six
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
13
Support includes conversion of existing data,software,documentation,and work procedures to those consistent with the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
14
Test scenarios (test plan)and test data are the deliverables that are produced after the ________ phase.

A)Testing
B)Training
C)Support
D)Documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
15
Program documentation is the deliverable that is produced after the ________ phase.

A)Testing
B)Coding
C)Installation
D)Support
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
16
List the six major activities in system implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
17
System documentation is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
18
The user guide is the deliverable that is produced after the ________ phase.

A)Training
B)Support
C)Installation
D)Documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
19
________ is the process whereby the physical design specifications created by the analysis team are turned into working computer code by the programming team.

A)Testing
B)Coding
C)Training
D)Installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
20
Code is the deliverable that is produced after the ________ phase.

A)Testing
B)Coding
C)Support
D)Installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
21
In a Master Test Plan,resulting test materials fall under which category?

A)Testing Requirements
B)Overall Plan
C)Procedure Control
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
22
In a Master Test Plan,test initiation falls under which category?

A)Introduction
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
23
In a Master Test Plan,hardware falls under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
24
In a Master Test Plan,description of system to be tested falls under which category?

A)Introduction
B)Overall Plan
C)Testing Requirements
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
25
Help desk is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
26
In a Master Test Plan,software and personnel fall under which category?

A)Introduction
B)Testing Requirements
C)Overall Plan
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
27
In a Master Test Plan,milestones,schedules,and locations fall under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Introduction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
28
In a Master Test Plan,criteria for passing tests and software description fall under which category?

A)Procedure Control
B)Overall Plan
C)Testing Requirements
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
29
Online help is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
30
In a Master Test Plan,document control falls under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
31
Training materials are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
32
Computer-based training aids are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
33
In a Master Test Plan,test materials fall under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
34
In a Master Test Plan,test execution and test failure fall under which category?

A)Overall Plan
B)Testing Requirements
C)Procedure Control
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
35
Inspection is a(n)________ technique in which participants examine program code for predictable language-specific errors.

A)Training
B)Testing
C)Support
D)Installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
36
Bulletin boards and other support mechanisms are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)Documentation
B)User Training Modules
C)User Training Plan
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
37
Tutorials are related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
38
In a Master Test Plan,method and attachments fall under which category?

A)Procedure Control
B)Overall Plan
C)Testing Requirements
D)Component-Specific Test Plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
39
________ is a testing technique in which the program code is sequentially executed manually by the reviewer.

A)Unit testing
B)Integration testing
C)Desk checking
D)Stub testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
40
User documentation is related to which category of deliverable for Documenting the System,Training,and Supporting Users?

A)User Training Plan
B)User Training Modules
C)Documentation
D)User Support Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
41
Testing managers are responsible for developing test plans,establishing testing standards,integrating testing and development activities in the life cycle,and ensuring that test plans are completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
42
During design,we develop a unit test plan,an integration test plan,and a system test plan and during support,these various plans are put into effect and the actual testing is performed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
43
To verify that a system meets its objectives,________ testing involves using non-live test data in a non-live testing environment.

A)Unit
B)System
C)Integration
D)Stub
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
44
________ testing sometimes is also called module testing.

A)Unit
B)System
C)Integration
D)Stub
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which installation tries out a new information system at one site and uses the experience to decide if and how the new system should be deployed throughout the organization?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
46
________ is an automated testing environment used to review code for errors,standards violations,and other design flaws.

A)Refactoring
B)Acceptance testing
C)Beta testing
D)A testing harness
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which installation changes from the old information system to the new one incrementally,starting with one or a few functional components and then gradually extends the installation to cover the whole new system?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
48
________ is defined as the process of making a program simpler after adding a new feature.

A)Refactoring
B)Testing harness
C)Desk checking
D)Beta testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
49
In ________ testing,each module is tested alone in an attempt to discover any errors in its code.

A)Unit
B)Stub
C)Integration
D)System
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
50
________ testing is a technique used in testing modules,especially where modules are written and tested in a top-down fashion,where a few lines of code are used to substitute for subordinate modules.

A)Unit
B)Stub
C)System
D)Integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
51
________ is the process whereby actual users test a completed information system.

A)Refactoring
B)Beta testing
C)Alpha testing
D)Acceptance testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
52
Which installation is also known as pilot installation?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
53
________ testing is defined as the process of bringing together all of the modules that a program comprises for testing purposes.

A)Unit
B)Stub
C)Integration
D)System
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
54
________ testing is defined as the process of bringing together all of the programs that a system comprises for testing purposes.

A)Unit
B)Integration
C)Stub
D)System
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
55
________ is the user testing of a completed information system using real data in the real user environment.

A)Testing harness
B)Beta testing
C)Alpha testing
D)Acceptance testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
56
________ is more than simply expanded integration testing,where you are testing the interfaces between programs in a system rather than testing the interfaces between modules in a program.

A)Unit testing
B)Stud testing
C)System testing
D)Desk checking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
57
Inspections are formal group activities where participants manually examine code for occurrences of well-known errors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which installation runs the old information system and the new one at the same time until management decides the old system can be turned off?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which installation is also known as staged installation?

A)Direct installation
B)Phased installation
C)Parallel installation
D)Single-location installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
60
________ is the user testing of a completed information system using simulated data.

A)Testing harness
B)Beta testing
C)Alpha testing
D)Acceptance testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
61
The people who create the test cases can be the same people as those who coded and tested the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
62
________ has written or other visual information about an application system,how it works,and how to use it.

A)An installation document
B)A design document
C)User documentation
D)System documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
63
Desk checking is the process of bringing together all of the modules that a program comprises for testing purposes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
64
Explain the four types of installation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
65
________ has detailed information about a system's design specifications,its internal workings,and its functionality.

A)An installation document
B)A design document
C)User documentation
D)System documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
66
Different forms of refactoring include simplifying complex statements,abstracting solutions from reusable code,and removing duplicate code.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
67
A help desk is a single point of contact for all user inquiries and problems about a particular information system or for all users in a particular department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
68
Non-live means that the data and situation are artificial,developed specifically for testing purposes,although both the data and the environment are similar to what users would encounter in everyday system use.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
69
The purpose of regression testing is for users to determine whether the system meets their requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
70
Support means providing ongoing educational and problem-solving assistance to information system users.For in-house developed systems,support materials and jobs will have to be prepared or designed as part of the implementation process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
71
The intent of the alpha test is to determine whether the software,documentation,technical support,and training activities work as intended.In essence,alpha testing can be viewed as a rehearsal of the installation phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
72
Under both integration and stub testing,not only do individual modules and programs get tested many times,so do the interfaces between modules and programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
73
System testing is more than simply expanded integration testing where you are testing the interfaces between programs in a system rather than testing the interfaces between modules in a program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
74
In many situations,a testing harness will greatly enhance the testing process because it can automatically expand the scope of the tests beyond the current development platform as well as be run every time there is a new version of the software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
75
What types of tests are performed during alpha testing?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
76
Define the way tests are organized according to Mosley.Provide the definition of each category.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
77
System documentation is written or other visual information about an application system,how it works,and how to use it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which implementation factor describes characteristics of the user,such as age and degree of computer experience in an information system?

A)Satisfaction
B)User demographics
C)Performance
D)Users personal stake
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
79
In alpha testing,the entire system is implemented in a test environment to discover whether the system is overtly destructive to itself or to the rest of the environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
80
In direct installation any errors resulting from the new system will have a direct impact on the users and how they do their jobs and,in some cases-depending on the centrality of the system to the organization-on how the organization performs its business.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.