Deck 15: Short-Term Scheduling

ملء الشاشة (f)
exit full mode
سؤال
What is the objective of scheduling?

A)maximize quality
B)minimize cost
C)minimize response time
D)prioritize and allocate demand to available facilities
E)minimize lead time
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Briefly describe how "the unexpected" makes short-term scheduling at Alaska Airlines a challenge.Also describe how Alaska Airlines meets that challenge,and achieves competitive advantage through short-term scheduling.
سؤال
In the sequence of decisions that affect scheduling,________ is (are)the immediate follower(s)of the master schedule (or master production schedule).
سؤال
Which of the following is not an effectiveness criterion for scheduling?

A)minimizing customer waiting time
B)minimizing completion time
C)minimizing WIP inventory
D)maximizing utilization
E)maximizing flow time
سؤال
The benefits of effective scheduling include lower cost,faster throughput,and dependable delivery.
سؤال
What makes short-term scheduling of strategic importance?
سؤال
Forward scheduling is the scheduling of:

A)the end items or finished products.
B)jobs as soon as the requirements are known.
C)the start items or component parts.
D)the final operation first beginning with the due date.
E)jobs according to their profit contributions.
سؤال
Forward scheduling:

A)begins with a delivery date,then offsets each operation one at a time,in reverse order.
B)has the same meaning as "finite loading."
C)is often used in service environments such as catering a banquet or scheduling surgery.
D)starts the schedule as soon as the job requirements are known.
E)produces a schedule only if it meets the due date.
سؤال
The short-term scheduling activity called "loading":

A)assigns dates to specific jobs or operations steps.
B)specifies the order in which jobs should be done at each center.
C)assigns jobs to work centers
D)assigns workers to jobs.
E)assigns workers to machines.
سؤال
Process-focused facilities and repetitive facilities generate forward-looking schedules,but process-focused facilities do this with JIT and kanban while repetitive facilities generally use MRP.
سؤال
Alaska Airlines uses mathematical short-term scheduling techniques and a high-tech nerve center to manage the rapid rescheduling necessary to cope with weather delays and similar disruptions.
سؤال
With forward scheduling,jobs are scheduled as late as possible within the time allowed by the customer due dates.
سؤال
Which of the following statements regarding scheduling at Alaska Airlines is FALSE?

A)Flying into Alaska complicates scheduling.
B)Schedule changes at one airport have a ripple effect that may have impacts in many others.
C)Alaska Airlines' high-tech computer and communications system is located in Seattle.
D)Alaska Airlines' rapid rescheduling uses mathematical scheduling models.
E)Alaska Airlines' rapid rescheduling promotes air safety and limits traveler inconvenience,but has not resulted in money savings for Alaska Airlines.
سؤال
Which of the following considers process capacity when scheduling?

A)cap loading
B)constrained loading
C)capacitated loading
D)backward loading
E)finite loading
سؤال
Short-term schedules are prepared:

A)directly from the aggregate plans.
B)directly from the capacity plans.
C)from inventory records for items that have been used up.
D)from master schedules,which are derived from aggregate plans.
E)from the purchasing plans.
سؤال
The correct sequence from longest to smallest duration scheduling is:

A)capacity planning,aggregate planning,master schedule,short-term scheduling.
B)aggregate planning,capacity planning,master schedule,short-term scheduling.
C)master schedule,capacity planning,aggregate planning,short-term scheduling.
D)master schedule,aggregate planning,capacity planning,short-term scheduling.
E)capacity planning,master schedule,aggregate planning,short-term scheduling.
سؤال
Which of the following is NOT a key direct benefit from effective internal or external scheduling?

A)lower cost
B)greater use of assets
C)more dependable delivery
D)higher quality
E)added flexibility
سؤال
One criterion for developing effective schedules is minimizing completion time.
سؤال
Short-term scheduling is important to efficiency and to cost reduction,but its impact is not of strategic importance.
سؤال
________ scheduling begins with the due date and schedules the final operation first and the other job steps in reverse order.
سؤال
Which of the following is an aid used to monitor jobs in progress?

A)a Gantt load chart
B)the assignment method
C)a Gantt schedule chart
D)Johnson's rule
E)a Gantt progress chart
سؤال
________ is the assignment of jobs to work or processing centers.
سؤال
A work center is interested in limiting work-in-process by not allowing production to start again until the current batch is finished.The best solution most likely involves:

A)MRP.
B)ConWIP cards.
C)Gantt charts.
D)Johnson's rule.
E)the assignment method.
سؤال
The assignment method provides an optimum,one-to-one assignment of jobs to resources.
سؤال
There are two jobs to be assigned to two workers.The profit for worker A on job 1 is $5 and on job 2 is $8.The profit for worker B on job 1 is $10 and on job 2 is $12.How should the work be divided using the assignment method?

A)worker A assigned to job 1 and worker B assigned to job 2
B)worker A assigned to job 2 and worker B assigned to job 1
C)worker A gets both jobs 1 and 2
D)worker B gets both jobs 1 and 2
E)unable to determine
سؤال
A Gantt load chart shows the loading and idle time of several departments,machines,or facilities.
سؤال
If job 5 takes 3,4 or 5 hours to be completed by workers A,B,and C,respectively,what would the row values for job 5 be after performing Step 1A of the assignment method?

A)3,4,5
B)8,9,10
C)0,1,2
D)6,7,8
E)1,4/3,5/3
سؤال
Explain,in your own words,how backward scheduling and forward scheduling differ.
سؤال
Gantt charts are useful for scheduling jobs,but not for loading them.
سؤال
What is a method of input-output control that uses a system of cards to limit the amount of work at a work center and also to control lead time and monitor backlog?

A)the assignment method
B)backward scheduling
C)forward scheduling
D)ConWIP cards
E)level material use
سؤال
The assignment method is:

A)a method to highlight overloads in a given work center.
B)a computerized method of determining appropriate tasks for an operation.
C)a form of linear programming for optimally assigning tasks or jobs to resources.
D)the same thing as the Gantt schedule chart.
E)a method for achieving a balance between forward and backward scheduling.
سؤال
The constant work-in-process (ConWIP)card aids input-output control by limiting the amount of work in a work center.
سؤال
Three jobs are to be assigned to three machines.Cost for each job-machine combination appears in the table below.Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column;then cover with straight lines).At this point in the problem-solving process: <strong>Three jobs are to be assigned to three machines.Cost for each job-machine combination appears in the table below.Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column;then cover with straight lines).At this point in the problem-solving process:  </strong> A)the row for Job 1 contains the values 5,6,and 0. B)calculations are complete,and the problem is ready for an optimal set of assignments. C)the column for Machine B indicates that it should be retired. D)Job 1 should be performed on Machine B. E)Job 1 should be performed on Machine A. <div style=padding-top: 35px>

A)the row for Job 1 contains the values 5,6,and 0.
B)calculations are complete,and the problem is ready for an optimal set of assignments.
C)the column for Machine B indicates that it should be retired.
D)Job 1 should be performed on Machine B.
E)Job 1 should be performed on Machine A.
سؤال
If an assignment problem consists of 5 workers and 4 projects:

A)one worker will not get a project assignment.
B)one project will be assigned two workers.
C)the fifth worker will split time among the four projects.
D)one project will not get a worker assigned.
E)The problem cannot be solved by assignment method.
سؤال
Which of the following is NOT required to be known in order to schedule process-focused facilities?

A)the sequence of work
B)which workers are assigned to each work center
C)the time required for each item
D)the capacity of each work center
E)the availability of each work center
سؤال
A work center had actual input of 280 hours and actual output of 270 hours.What is the change in backlog?

A)10
B)-10
C)0
D)1.037
E)Unable to determine with the given information
سؤال
If an assignment problem consists of 6 workers and 7 projects:

A)one worker will not get a project assignment.
B)one worker will be assigned two projects.
C)each worker will contribute work toward the seventh project.
D)one project will not get a worker assigned.
E)The problem cannot be solved by assignment method.
سؤال
What is a scheduling technique used to achieve an optimum,one-to-one matching of tasks and resources?

A)the assignment method
B)Johnson's rule
C)the CDS algorithm
D)the appointment method
E)the reservation method
سؤال
A work center had planned outputs of 10,15,13,and 20 hours with actual outputs of 12,14,13,and 18 hours.What is the cumulative deviation in output?

A)0
B)1
C)-1
D)58
E)Unable to determine with the given information
سؤال
Compare short-term scheduling at process-focused,repetitive,and product-focused facilities.
سؤال
What is the assignment method?
سؤال
The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the longest processing time rule,what is the lateness of job A? <strong>The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the longest processing time rule,what is the lateness of job A?  </strong> A)0.0 days B)24.0 days C)7.4 days D)9.0 days E)11.6 days <div style=padding-top: 35px>

A)0.0 days
B)24.0 days
C)7.4 days
D)9.0 days
E)11.6 days
سؤال
Identify the major disadvantages of the Gantt load chart.
سؤال
EDD stands for what?

A)earliest due date
B)earliest design date
C)earliest detrimental date
D)earliest decision date
E)economic date determination
سؤال
The critical ratio sequencing rule prioritizes the jobs based on the importance or value of the customers who have placed the orders.
سؤال
Using LPT priority would result in what sequence for Jobs A,B,C,and D if their process times are 4,6,5,and 2 respectively?

A)ABCD
B)DCBA
C)DACB
D)DABC
E)BCAD
سؤال
The ________ is a special class of linear programming models that involves assigning tasks or jobs to resources.
سؤال
The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the shortest processing time rule,what is the average completion time? <strong>The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the shortest processing time rule,what is the average completion time?  </strong> A)47.6 days B)60.2 days C)94.0 days D)2.5 days E)238.0 days <div style=padding-top: 35px>

A)47.6 days
B)60.2 days
C)94.0 days
D)2.5 days
E)238.0 days
سؤال
________ cards are used to control the amount of work in a work center,aiding input-output control.
سؤال
Machines A,B,C,and D have been in use for several years,while machine E is new.The following table provides data on the value of production of each job when performed on a specific machine.
(a)Determine the set of assignments that maximizes production value.
(b)What is the total production value of your assignments?
(c)Which machine should be retired (i.e. ,gets no assignment)?
Machines A,B,C,and D have been in use for several years,while machine E is new.The following table provides data on the value of production of each job when performed on a specific machine. (a)Determine the set of assignments that maximizes production value. (b)What is the total production value of your assignments? (c)Which machine should be retired (i.e. ,gets no assignment)?  <div style=padding-top: 35px>
سؤال
Lockport Marine Services,Inc.wishes to assign a set of jobs to a set of machines.The following table provides data on the cost of production of each job when performed on a specific machine.
(a)Determine the set of assignments that minimizes production cost.
(b)What is the total production cost of your assignments?
Lockport Marine Services,Inc.wishes to assign a set of jobs to a set of machines.The following table provides data on the cost of production of each job when performed on a specific machine. (a)Determine the set of assignments that minimizes production cost. (b)What is the total production cost of your assignments?  <div style=padding-top: 35px>
سؤال
Orders are processed in the sequence in which they arrive if (the)________ rule sequences the jobs.

A)earliest due date
B)slack time remaining
C)first come,first served
D)critical ratio
E)Johnson's
سؤال
Dispatching rules are typically judged by four effectiveness criteria: average completion time,utilization,average number of jobs in the system,and average job lateness.
سؤال
What is the difference between a Gantt load chart and a Gantt scheduling chart?
سؤال
Earliest due date is a shop floor dispatching (sequencing)rule that relates the time available to complete a job to the amount of work left to be completed.
سؤال
Johnson's rule sequences a set of jobs through two different machines or work centers in the same order.
سؤال
________ are planning charts used to schedule resources and allocate time.
سؤال
What is input-output control?
سؤال
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client.Accordingly,she has estimated the time it should take for each of her top consultants-Charlie,Gerald,Johnny,and Rick-to complete any of the four projects,as follows:
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client.Accordingly,she has estimated the time it should take for each of her top consultants-Charlie,Gerald,Johnny,and Rick-to complete any of the four projects,as follows:   (a)What is the total number of hours required by the following arbitrary assignment? Charlie→B;Gerald→A;Johnny→D;Rick→C (b)What is the optimal assignment of consultants to projects? (Use the assignment method. ) (c)For the optimal schedule,what is the total number of hours it will take these consultants to complete these projects?<div style=padding-top: 35px> (a)What is the total number of hours required by the following arbitrary assignment?
Charlie→B;Gerald→A;Johnny→D;Rick→C
(b)What is the optimal assignment of consultants to projects? (Use the assignment method. )
(c)For the optimal schedule,what is the total number of hours it will take these consultants to complete these projects?
سؤال
Which of the following dispatching rules ordinarily gives the best results when the criterion is quickest time for completion of the full sequence of jobs?

A)shortest processing time (SPT)
B)critical ratio (CR)
C)first in,first out (FIFO)
D)first come,first served (FCFS)
E)longest processing time (LPT)
سؤال
Sequencing (or dispatching):

A)assigns dates to specific jobs or operations steps.
B)assigns jobs to work centers.
C)specifies the order in which jobs should be done at each center.
D)assigns workers to jobs.
E)assigns workers to machines.
سؤال
The priority rule that appears fair to customers in service systems is ________.
سؤال
Eight jobs have been sequenced at a single work center.Total processing time for the eight jobs is 34 hours,and total flow time for the sequence is 85 hours.For this schedule,utilization is ________ and the average number of jobs in the system is ________.

A)100 percent;10.625
B)low;.0941
C)0.400 or 40 percent;2.5
D)0.235 or 23.5 percent;4.25
E)maximized;minimized
سؤال
Which of the following is an advantage of the FCFS dispatching rule when used in services?

A)FCFS maximizes utilization.
B)FCFS minimizes the average number of jobs in the system.
C)FCFS minimizes the average lateness of all jobs.
D)FCFS maximizes the number of jobs completed on time.
E)FCFS seems fair to customers.
سؤال
What is the priority rule that sequences jobs using the smallest ratio of due date from today to processing time?

A)critical ratio
B)earliest due date
C)first come,first served
D)longest processing time
E)shortest processing time
سؤال
Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs? <strong>Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs?  </strong> A)V-T-S-U-R;225 B)U-R-T-S-V;175 C)R-S-T-U-V;240 D)U-S-V-T-R;200 E)R-U-T-S-V;175 <div style=padding-top: 35px>

A)V-T-S-U-R;225
B)U-R-T-S-V;175
C)R-S-T-U-V;240
D)U-S-V-T-R;200
E)R-U-T-S-V;175
سؤال
Which of the following dispatching rules tends to minimize job flow time?

A)FCFS: first come,first served
B)SPT: shortest processing time
C)EDD: earliest due date
D)LPT: longest processing time
E)FCLS: first come,last served
سؤال
Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the shortest processing time dispatching rule,in which order should the jobs be processed? <strong>Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the shortest processing time dispatching rule,in which order should the jobs be processed?  </strong> A)A,B,C,D,E B)C,E,A,D,B C)B,D,A,E,C D)D,A,E,B,C E)C,E,A,B,D <div style=padding-top: 35px>

A)A,B,C,D,E
B)C,E,A,D,B
C)B,D,A,E,C
D)D,A,E,B,C
E)C,E,A,B,D
سؤال
________ determines the order in which jobs should be done at each work center.
سؤال
________ determine the sequence of jobs in process-oriented facilities.
سؤال
Which critical ratio value implies that a job is already late?

A)more than 100
B)1
C)less than 1
D)10
E)3.4
سؤال
Which of the following is a limitation of rules-based dispatching systems?

A)Rules need to be revised to adjust to changes in orders,product mix,and so forth.
B)Rules may not recognize idle resources.
C)Rules may not recognize bottleneck resources
D)Rules may not be able to prioritize two jobs with identical due dates.
E)All of the above are limitations.
سؤال
Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,which job should be scheduled first in the sequence? <strong>Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,which job should be scheduled first in the sequence?  </strong> A)R B)S C)T D)U E)V <div style=padding-top: 35px>

A)R
B)S
C)T
D)U
E)V
سؤال
Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the earliest due date dispatching rule,in which order should the jobs be processed? <strong>Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the earliest due date dispatching rule,in which order should the jobs be processed?  </strong> A)C,E,A,D,B B)A,B,C,D,E C)B,D,A,E,C D)C,B,A,E,D E)B,D,A,C,E <div style=padding-top: 35px>

A)C,E,A,D,B
B)A,B,C,D,E
C)B,D,A,E,C
D)C,B,A,E,D
E)B,D,A,C,E
سؤال
Average completion time for a schedule sequence at a work center is the ratio of:

A)total processing time to the number of jobs.
B)total flow time to total processing time.
C)total flow time to the number of jobs.
D)total processing time plus total late time to the number of jobs.
E)total flow time plus total late time to the number of jobs.
سؤال
Five welding jobs are waiting to be processed.Their processing times and due dates are given below.Using the critical ratio dispatching rule,in which order should the jobs be processed? All dates are specified as days from today. <strong>Five welding jobs are waiting to be processed.Their processing times and due dates are given below.Using the critical ratio dispatching rule,in which order should the jobs be processed? All dates are specified as days from today.  </strong> A)B,D,A,E,C B)C,D,A,B,E C)C,E,A,D,B D)E,B,A,D,C E)B,D,A,C,E <div style=padding-top: 35px>

A)B,D,A,E,C
B)C,D,A,B,E
C)C,E,A,D,B
D)E,B,A,D,C
E)B,D,A,C,E
سؤال
What does the use of the shortest processing time sequencing rule generally produce?

A)maximum average lateness
B)maximum utilization
C)maximum effectiveness
D)minimum average flow time
E)B and D
سؤال
When a set of jobs must pass through two workstations whose sequence is fixed,________ is the sequencing rule most commonly applied.

A)critical ratio
B)earliest due date
C)first come,first served
D)slack time remaining
E)Johnson's rule
سؤال
Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Sigma before work center Delta.According to Johnson's rule,what sequence of jobs will minimize the completion time for all jobs? <strong>Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Sigma before work center Delta.According to Johnson's rule,what sequence of jobs will minimize the completion time for all jobs?  </strong> A)R-S-T-U-V B)S-V-T-R-U C)S-U-T-V-R D)V-R-U-S-T E)R-V-T-S-U <div style=padding-top: 35px>

A)R-S-T-U-V
B)S-V-T-R-U
C)S-U-T-V-R
D)V-R-U-S-T
E)R-V-T-S-U
سؤال
Flow time represents the time:

A)an order spends waiting for processing at a work center.
B)an order spends being processed at a work center.
C)an order spends moving from one work center to another.
D)to complete an order,including time spent in processing and in waiting.
E)none of the above
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/116
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Short-Term Scheduling
1
What is the objective of scheduling?

A)maximize quality
B)minimize cost
C)minimize response time
D)prioritize and allocate demand to available facilities
E)minimize lead time
D
2
Briefly describe how "the unexpected" makes short-term scheduling at Alaska Airlines a challenge.Also describe how Alaska Airlines meets that challenge,and achieves competitive advantage through short-term scheduling.
The unexpected refers to delays and cancellations that are largely weather-related.These events require rapid rescheduling in order to keep operations going and to keep passengers from becoming too inconvenienced.Alaska Airlines' solution involves a high-tech nerve center of computers and communications gear,and it uses mathematical models to reroute and reschedule as quickly as possible.
3
In the sequence of decisions that affect scheduling,________ is (are)the immediate follower(s)of the master schedule (or master production schedule).
short-term schedules
4
Which of the following is not an effectiveness criterion for scheduling?

A)minimizing customer waiting time
B)minimizing completion time
C)minimizing WIP inventory
D)maximizing utilization
E)maximizing flow time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
5
The benefits of effective scheduling include lower cost,faster throughput,and dependable delivery.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
6
What makes short-term scheduling of strategic importance?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
7
Forward scheduling is the scheduling of:

A)the end items or finished products.
B)jobs as soon as the requirements are known.
C)the start items or component parts.
D)the final operation first beginning with the due date.
E)jobs according to their profit contributions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
8
Forward scheduling:

A)begins with a delivery date,then offsets each operation one at a time,in reverse order.
B)has the same meaning as "finite loading."
C)is often used in service environments such as catering a banquet or scheduling surgery.
D)starts the schedule as soon as the job requirements are known.
E)produces a schedule only if it meets the due date.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
9
The short-term scheduling activity called "loading":

A)assigns dates to specific jobs or operations steps.
B)specifies the order in which jobs should be done at each center.
C)assigns jobs to work centers
D)assigns workers to jobs.
E)assigns workers to machines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
10
Process-focused facilities and repetitive facilities generate forward-looking schedules,but process-focused facilities do this with JIT and kanban while repetitive facilities generally use MRP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
11
Alaska Airlines uses mathematical short-term scheduling techniques and a high-tech nerve center to manage the rapid rescheduling necessary to cope with weather delays and similar disruptions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
12
With forward scheduling,jobs are scheduled as late as possible within the time allowed by the customer due dates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following statements regarding scheduling at Alaska Airlines is FALSE?

A)Flying into Alaska complicates scheduling.
B)Schedule changes at one airport have a ripple effect that may have impacts in many others.
C)Alaska Airlines' high-tech computer and communications system is located in Seattle.
D)Alaska Airlines' rapid rescheduling uses mathematical scheduling models.
E)Alaska Airlines' rapid rescheduling promotes air safety and limits traveler inconvenience,but has not resulted in money savings for Alaska Airlines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following considers process capacity when scheduling?

A)cap loading
B)constrained loading
C)capacitated loading
D)backward loading
E)finite loading
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
15
Short-term schedules are prepared:

A)directly from the aggregate plans.
B)directly from the capacity plans.
C)from inventory records for items that have been used up.
D)from master schedules,which are derived from aggregate plans.
E)from the purchasing plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
16
The correct sequence from longest to smallest duration scheduling is:

A)capacity planning,aggregate planning,master schedule,short-term scheduling.
B)aggregate planning,capacity planning,master schedule,short-term scheduling.
C)master schedule,capacity planning,aggregate planning,short-term scheduling.
D)master schedule,aggregate planning,capacity planning,short-term scheduling.
E)capacity planning,master schedule,aggregate planning,short-term scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following is NOT a key direct benefit from effective internal or external scheduling?

A)lower cost
B)greater use of assets
C)more dependable delivery
D)higher quality
E)added flexibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
18
One criterion for developing effective schedules is minimizing completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
19
Short-term scheduling is important to efficiency and to cost reduction,but its impact is not of strategic importance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
20
________ scheduling begins with the due date and schedules the final operation first and the other job steps in reverse order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is an aid used to monitor jobs in progress?

A)a Gantt load chart
B)the assignment method
C)a Gantt schedule chart
D)Johnson's rule
E)a Gantt progress chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
22
________ is the assignment of jobs to work or processing centers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
23
A work center is interested in limiting work-in-process by not allowing production to start again until the current batch is finished.The best solution most likely involves:

A)MRP.
B)ConWIP cards.
C)Gantt charts.
D)Johnson's rule.
E)the assignment method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
24
The assignment method provides an optimum,one-to-one assignment of jobs to resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
25
There are two jobs to be assigned to two workers.The profit for worker A on job 1 is $5 and on job 2 is $8.The profit for worker B on job 1 is $10 and on job 2 is $12.How should the work be divided using the assignment method?

A)worker A assigned to job 1 and worker B assigned to job 2
B)worker A assigned to job 2 and worker B assigned to job 1
C)worker A gets both jobs 1 and 2
D)worker B gets both jobs 1 and 2
E)unable to determine
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
26
A Gantt load chart shows the loading and idle time of several departments,machines,or facilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
27
If job 5 takes 3,4 or 5 hours to be completed by workers A,B,and C,respectively,what would the row values for job 5 be after performing Step 1A of the assignment method?

A)3,4,5
B)8,9,10
C)0,1,2
D)6,7,8
E)1,4/3,5/3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
28
Explain,in your own words,how backward scheduling and forward scheduling differ.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
29
Gantt charts are useful for scheduling jobs,but not for loading them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
30
What is a method of input-output control that uses a system of cards to limit the amount of work at a work center and also to control lead time and monitor backlog?

A)the assignment method
B)backward scheduling
C)forward scheduling
D)ConWIP cards
E)level material use
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
31
The assignment method is:

A)a method to highlight overloads in a given work center.
B)a computerized method of determining appropriate tasks for an operation.
C)a form of linear programming for optimally assigning tasks or jobs to resources.
D)the same thing as the Gantt schedule chart.
E)a method for achieving a balance between forward and backward scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
32
The constant work-in-process (ConWIP)card aids input-output control by limiting the amount of work in a work center.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
33
Three jobs are to be assigned to three machines.Cost for each job-machine combination appears in the table below.Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column;then cover with straight lines).At this point in the problem-solving process: <strong>Three jobs are to be assigned to three machines.Cost for each job-machine combination appears in the table below.Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column;then cover with straight lines).At this point in the problem-solving process:  </strong> A)the row for Job 1 contains the values 5,6,and 0. B)calculations are complete,and the problem is ready for an optimal set of assignments. C)the column for Machine B indicates that it should be retired. D)Job 1 should be performed on Machine B. E)Job 1 should be performed on Machine A.

A)the row for Job 1 contains the values 5,6,and 0.
B)calculations are complete,and the problem is ready for an optimal set of assignments.
C)the column for Machine B indicates that it should be retired.
D)Job 1 should be performed on Machine B.
E)Job 1 should be performed on Machine A.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
34
If an assignment problem consists of 5 workers and 4 projects:

A)one worker will not get a project assignment.
B)one project will be assigned two workers.
C)the fifth worker will split time among the four projects.
D)one project will not get a worker assigned.
E)The problem cannot be solved by assignment method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is NOT required to be known in order to schedule process-focused facilities?

A)the sequence of work
B)which workers are assigned to each work center
C)the time required for each item
D)the capacity of each work center
E)the availability of each work center
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
36
A work center had actual input of 280 hours and actual output of 270 hours.What is the change in backlog?

A)10
B)-10
C)0
D)1.037
E)Unable to determine with the given information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
37
If an assignment problem consists of 6 workers and 7 projects:

A)one worker will not get a project assignment.
B)one worker will be assigned two projects.
C)each worker will contribute work toward the seventh project.
D)one project will not get a worker assigned.
E)The problem cannot be solved by assignment method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
38
What is a scheduling technique used to achieve an optimum,one-to-one matching of tasks and resources?

A)the assignment method
B)Johnson's rule
C)the CDS algorithm
D)the appointment method
E)the reservation method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
39
A work center had planned outputs of 10,15,13,and 20 hours with actual outputs of 12,14,13,and 18 hours.What is the cumulative deviation in output?

A)0
B)1
C)-1
D)58
E)Unable to determine with the given information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
40
Compare short-term scheduling at process-focused,repetitive,and product-focused facilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is the assignment method?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
42
The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the longest processing time rule,what is the lateness of job A? <strong>The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the longest processing time rule,what is the lateness of job A?  </strong> A)0.0 days B)24.0 days C)7.4 days D)9.0 days E)11.6 days

A)0.0 days
B)24.0 days
C)7.4 days
D)9.0 days
E)11.6 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
43
Identify the major disadvantages of the Gantt load chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
44
EDD stands for what?

A)earliest due date
B)earliest design date
C)earliest detrimental date
D)earliest decision date
E)economic date determination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
45
The critical ratio sequencing rule prioritizes the jobs based on the importance or value of the customers who have placed the orders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
46
Using LPT priority would result in what sequence for Jobs A,B,C,and D if their process times are 4,6,5,and 2 respectively?

A)ABCD
B)DCBA
C)DACB
D)DABC
E)BCAD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
47
The ________ is a special class of linear programming models that involves assigning tasks or jobs to resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
48
The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the shortest processing time rule,what is the average completion time? <strong>The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the shortest processing time rule,what is the average completion time?  </strong> A)47.6 days B)60.2 days C)94.0 days D)2.5 days E)238.0 days

A)47.6 days
B)60.2 days
C)94.0 days
D)2.5 days
E)238.0 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
49
________ cards are used to control the amount of work in a work center,aiding input-output control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
50
Machines A,B,C,and D have been in use for several years,while machine E is new.The following table provides data on the value of production of each job when performed on a specific machine.
(a)Determine the set of assignments that maximizes production value.
(b)What is the total production value of your assignments?
(c)Which machine should be retired (i.e. ,gets no assignment)?
Machines A,B,C,and D have been in use for several years,while machine E is new.The following table provides data on the value of production of each job when performed on a specific machine. (a)Determine the set of assignments that maximizes production value. (b)What is the total production value of your assignments? (c)Which machine should be retired (i.e. ,gets no assignment)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
51
Lockport Marine Services,Inc.wishes to assign a set of jobs to a set of machines.The following table provides data on the cost of production of each job when performed on a specific machine.
(a)Determine the set of assignments that minimizes production cost.
(b)What is the total production cost of your assignments?
Lockport Marine Services,Inc.wishes to assign a set of jobs to a set of machines.The following table provides data on the cost of production of each job when performed on a specific machine. (a)Determine the set of assignments that minimizes production cost. (b)What is the total production cost of your assignments?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
52
Orders are processed in the sequence in which they arrive if (the)________ rule sequences the jobs.

A)earliest due date
B)slack time remaining
C)first come,first served
D)critical ratio
E)Johnson's
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
53
Dispatching rules are typically judged by four effectiveness criteria: average completion time,utilization,average number of jobs in the system,and average job lateness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
54
What is the difference between a Gantt load chart and a Gantt scheduling chart?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
55
Earliest due date is a shop floor dispatching (sequencing)rule that relates the time available to complete a job to the amount of work left to be completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
56
Johnson's rule sequences a set of jobs through two different machines or work centers in the same order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
57
________ are planning charts used to schedule resources and allocate time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
58
What is input-output control?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
59
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client.Accordingly,she has estimated the time it should take for each of her top consultants-Charlie,Gerald,Johnny,and Rick-to complete any of the four projects,as follows:
The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client.Accordingly,she has estimated the time it should take for each of her top consultants-Charlie,Gerald,Johnny,and Rick-to complete any of the four projects,as follows:   (a)What is the total number of hours required by the following arbitrary assignment? Charlie→B;Gerald→A;Johnny→D;Rick→C (b)What is the optimal assignment of consultants to projects? (Use the assignment method. ) (c)For the optimal schedule,what is the total number of hours it will take these consultants to complete these projects? (a)What is the total number of hours required by the following arbitrary assignment?
Charlie→B;Gerald→A;Johnny→D;Rick→C
(b)What is the optimal assignment of consultants to projects? (Use the assignment method. )
(c)For the optimal schedule,what is the total number of hours it will take these consultants to complete these projects?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following dispatching rules ordinarily gives the best results when the criterion is quickest time for completion of the full sequence of jobs?

A)shortest processing time (SPT)
B)critical ratio (CR)
C)first in,first out (FIFO)
D)first come,first served (FCFS)
E)longest processing time (LPT)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
61
Sequencing (or dispatching):

A)assigns dates to specific jobs or operations steps.
B)assigns jobs to work centers.
C)specifies the order in which jobs should be done at each center.
D)assigns workers to jobs.
E)assigns workers to machines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
62
The priority rule that appears fair to customers in service systems is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
63
Eight jobs have been sequenced at a single work center.Total processing time for the eight jobs is 34 hours,and total flow time for the sequence is 85 hours.For this schedule,utilization is ________ and the average number of jobs in the system is ________.

A)100 percent;10.625
B)low;.0941
C)0.400 or 40 percent;2.5
D)0.235 or 23.5 percent;4.25
E)maximized;minimized
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is an advantage of the FCFS dispatching rule when used in services?

A)FCFS maximizes utilization.
B)FCFS minimizes the average number of jobs in the system.
C)FCFS minimizes the average lateness of all jobs.
D)FCFS maximizes the number of jobs completed on time.
E)FCFS seems fair to customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
65
What is the priority rule that sequences jobs using the smallest ratio of due date from today to processing time?

A)critical ratio
B)earliest due date
C)first come,first served
D)longest processing time
E)shortest processing time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
66
Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs? <strong>Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs?  </strong> A)V-T-S-U-R;225 B)U-R-T-S-V;175 C)R-S-T-U-V;240 D)U-S-V-T-R;200 E)R-U-T-S-V;175

A)V-T-S-U-R;225
B)U-R-T-S-V;175
C)R-S-T-U-V;240
D)U-S-V-T-R;200
E)R-U-T-S-V;175
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following dispatching rules tends to minimize job flow time?

A)FCFS: first come,first served
B)SPT: shortest processing time
C)EDD: earliest due date
D)LPT: longest processing time
E)FCLS: first come,last served
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
68
Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the shortest processing time dispatching rule,in which order should the jobs be processed? <strong>Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the shortest processing time dispatching rule,in which order should the jobs be processed?  </strong> A)A,B,C,D,E B)C,E,A,D,B C)B,D,A,E,C D)D,A,E,B,C E)C,E,A,B,D

A)A,B,C,D,E
B)C,E,A,D,B
C)B,D,A,E,C
D)D,A,E,B,C
E)C,E,A,B,D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
69
________ determines the order in which jobs should be done at each work center.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
70
________ determine the sequence of jobs in process-oriented facilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
71
Which critical ratio value implies that a job is already late?

A)more than 100
B)1
C)less than 1
D)10
E)3.4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which of the following is a limitation of rules-based dispatching systems?

A)Rules need to be revised to adjust to changes in orders,product mix,and so forth.
B)Rules may not recognize idle resources.
C)Rules may not recognize bottleneck resources
D)Rules may not be able to prioritize two jobs with identical due dates.
E)All of the above are limitations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
73
Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,which job should be scheduled first in the sequence? <strong>Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,which job should be scheduled first in the sequence?  </strong> A)R B)S C)T D)U E)V

A)R
B)S
C)T
D)U
E)V
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
74
Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the earliest due date dispatching rule,in which order should the jobs be processed? <strong>Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the earliest due date dispatching rule,in which order should the jobs be processed?  </strong> A)C,E,A,D,B B)A,B,C,D,E C)B,D,A,E,C D)C,B,A,E,D E)B,D,A,C,E

A)C,E,A,D,B
B)A,B,C,D,E
C)B,D,A,E,C
D)C,B,A,E,D
E)B,D,A,C,E
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
75
Average completion time for a schedule sequence at a work center is the ratio of:

A)total processing time to the number of jobs.
B)total flow time to total processing time.
C)total flow time to the number of jobs.
D)total processing time plus total late time to the number of jobs.
E)total flow time plus total late time to the number of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
76
Five welding jobs are waiting to be processed.Their processing times and due dates are given below.Using the critical ratio dispatching rule,in which order should the jobs be processed? All dates are specified as days from today. <strong>Five welding jobs are waiting to be processed.Their processing times and due dates are given below.Using the critical ratio dispatching rule,in which order should the jobs be processed? All dates are specified as days from today.  </strong> A)B,D,A,E,C B)C,D,A,B,E C)C,E,A,D,B D)E,B,A,D,C E)B,D,A,C,E

A)B,D,A,E,C
B)C,D,A,B,E
C)C,E,A,D,B
D)E,B,A,D,C
E)B,D,A,C,E
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
77
What does the use of the shortest processing time sequencing rule generally produce?

A)maximum average lateness
B)maximum utilization
C)maximum effectiveness
D)minimum average flow time
E)B and D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
78
When a set of jobs must pass through two workstations whose sequence is fixed,________ is the sequencing rule most commonly applied.

A)critical ratio
B)earliest due date
C)first come,first served
D)slack time remaining
E)Johnson's rule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
79
Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Sigma before work center Delta.According to Johnson's rule,what sequence of jobs will minimize the completion time for all jobs? <strong>Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Sigma before work center Delta.According to Johnson's rule,what sequence of jobs will minimize the completion time for all jobs?  </strong> A)R-S-T-U-V B)S-V-T-R-U C)S-U-T-V-R D)V-R-U-S-T E)R-V-T-S-U

A)R-S-T-U-V
B)S-V-T-R-U
C)S-U-T-V-R
D)V-R-U-S-T
E)R-V-T-S-U
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
80
Flow time represents the time:

A)an order spends waiting for processing at a work center.
B)an order spends being processed at a work center.
C)an order spends moving from one work center to another.
D)to complete an order,including time spent in processing and in waiting.
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 116 في هذه المجموعة.