Deck 12: Implementing Businessit Solutions

ملء الشاشة (f)
exit full mode
سؤال
Most successful Web sites are built to specifications that satisfy executives, rather than customers or users.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Microsoft FrontPage is an example of an easy-to-use, end user website development tool.
سؤال
Most successful Web sites use complicated color designs so speed of loading the pages is not a concern.
سؤال
User interface design is frequently a prototyping process with end user input.
سؤال
In a logical model, a person's inbox is treated just like a computer hard drive.
سؤال
Many Web sites have their own search engines, but very few are actually useful.
سؤال
Analyzing the information needs of employees, customers, and other business stakeholders is done during the systems investigation stage of the application development life cycle.
سؤال
Technology has now advanced to the point where a Web site that looks good in one browser on a particular hardware platform will also look great on every other platform and browser.
سؤال
The danger of a technical feasibility study is finding technology that does not yet exist in a stable form.
سؤال
By creating a logical model, the various computer hardware components of a system can be incorporated, analyzed, and understood.
سؤال
Some of the coolest stuff on the Web, such as streaming video, can't be accessed by most Web surfers.
سؤال
There is little that can be learned from studying the system that will be replaced.
سؤال
The most basic protection against accidental lost or damage to end user files is to simply make backup copies on a frequent and systematic basis.
سؤال
"Shadow" IT is a culture where users install "rogue" software or tamper with existing software without the consent of the IT department.
سؤال
Making users fill out long registration forms is a great way to attract users to your Web site because most people enjoy filling out forms and giving out personal information online.
سؤال
Systems analysts may recycle back at any time during the systems development cycle in order to modify and improve a system under development, but users do not.
سؤال
Keeping the links updated on a Web page is a very difficult, manual job because there is no software available that can do this for you.
سؤال
In all cases, a preliminary feasibility assessment is a necessary step.
سؤال
The application development capabilities built into a variety of software packages have made it easier for many users to develop their own computer-based solutions.
سؤال
Since most Web users today are very competent with technology, most Web sites do not need site maps or need to be easily navigated.
سؤال
Pilot conversion may be the best choice in situations where an automated system is replacing a manual one.
سؤال
Direct conversion should be considered only in extreme circumstances, where no other conversion strategy is available.
سؤال
Systems integrators take over complete responsibility for an organization's computer facilities when an organization out-sources its computer operations.
سؤال
With a pilot conversion, the old and new systems are run simultaneously until the end users and project coordinators are fully satisfied that the new system is functioning correctly and the old system is no longer necessary.
سؤال
Improperly organized and formatted data are seldom found to be a major contributor to new system implementation failures.
سؤال
These days, evaluating hardware is pretty much limited to speed and pricing.
سؤال
According to the textbook case, IT departments are focusing too much on technology to solve a problem rather than on the problem itself.
سؤال
A well-designed system can survive an improperly-executed implementation.
سؤال
The performance of hardware and software can nearly always be determined by obtaining and reading the documentation and case studies supplied by hardware and software suppliers.
سؤال
Unless the operational costs of the new system are significantly less than the old system, the cost of parallel operation can be as much as four times greater than the old system alone.
سؤال
Every project objective and every activity associated with that objective must be identified and sequenced.
سؤال
Although having the advantage of low risk, the parallel conversion approach also brings with it the highest cost.
سؤال
The pilot conversion approach may be required if individual sites or locations have unique characteristics or idiosyncrasies that make a direct or parallel approach unfeasible.
سؤال
Other users are frequently the best source of the information needed to evaluate the claims of manufacturers and suppliers.
سؤال
New systems can be designed to use existing data files, and that is normally the case.
سؤال
The beginning of the end of a project is the implementation and installation of the project deliverables.
سؤال
The resource allocation report contains information related to the difference between actual and planned project progress.
سؤال
Installing a new application may require converting the data elements in databases that are affected by the new application into new formats.
سؤال
Systems integrators specialize in providing industry-specific hardware, software, and services from selected manufacturers.
سؤال
An RFQ is used as the basis for preparing a proposed purchase agreement.
سؤال
According to the text case, some organizations using PPM simply end projects that go bad.
سؤال
Determining whether expected cost savings, increased profits, and other benefits exceed the cost of developing and operating a system is related to _______________ feasibility.

A) economic
B) functional
C) operational
D) system
سؤال
According to the text, certain changes in _______________ may dictate the need for change, regardless of the assessed feasibility of such change.

A) the business environment
B) product specifications
C) management structure
D) technical system requirements
سؤال
Which of the following is done during the systems design stage of application development?

A) Develop logical models of the current system
B) Conduct a feasibility study
C) Develop logical models of new system
D) Convert to the new business system
سؤال
In a typical organization, more programmers and analysts are assigned to application maintenance activities than to application development.
سؤال
The parallel conversion approach takes the most time and, thus, creates the most disruption to the organization over time.
سؤال
Preventive maintenance activities involve changes to an existing system that are intended to improve the performance of a function or interface.
سؤال
A feasibility study will answer all of the following questions except:

A) Does the technology exist that is necessary to implement the proposed system?
B) Is the proposed system technologically, economically, and operationally feasible?
C) Which brand and model of computer will be used by the proposed system?
D) What impact will the proposed system have on current employees?
سؤال
Which of the following is done during the systems analysis stage of application development?

A) Develop logical models of the current system
B) Conduct a feasibility study
C) Develop logical models of new system
D) Test the system, and train people to operate and use it
سؤال
All of the following are done during the systems implementation stage of application development, except:

A) Develop logical models of the current system
B) Acquire or develop hardware and software
C) Convert to the new business system
D) Manage the effects of system changes on end users
سؤال
Which of the following is done during the systems maintenance stage of application development?

A) Develop logical models of the current system
B) Monitor, evaluate, and modify the business system as needed
C) Develop logical models of new system
D) Convert to the new business system
سؤال
The overall process by which information systems are designed and implemented within organizations is referred to as systems _______________.

A) design
B) analysis
C) analysis and design
D) implementation
سؤال
Systems thinking means all the following, except:

A) Seeing inter-relationships among systems and processes
B) Seeing processes of change among systems, rather than discrete snapshots of change
C) Seeing linear cause-and-effects when events occur
D) Seeing the forest and the trees in any situation
سؤال
Managers do not need to be trained on the new system as long as the end users have been trained.
سؤال
All of the following are done during the systems investigation stage of application development, except:

A) Develop logical models of the current system
B) Conduct a feasibility study
C) Determine how to address business opportunities and priorities
D) Develop a project management plan and obtain management approval
سؤال
A feasibility study is a preliminary study to investigate the information needs of prospective users and is used to determine the proposed system's _______________.

A) resource requirements
B) costs and benefits
C) feasibility
D) All of the choices are correct.
سؤال
The _______________ feasibility assessment focuses on the degree to which the proposed development project fits with the existing business environment and objectives, with regard to development schedule, delivery date, corporate culture, and existing business processes.

A) technical
B) legal/political
C) economic
D) operational
سؤال
Which of the following correctly reflects the stages of the system development life cycle?

A) Investigation, analysis, implementation, and maintenance
B) Analysis, design, and implementation
C) Investigation, analysis, design, implementation, and maintenance
D) Investigation, prototyping, design, conversion, and change management
سؤال
Systems thinking means that an individual sees:

A) Inter-relationships among systems and processes
B) Discrete snapshots of change, whenever it occurs
C) Linear cause-and-effects when events occur
D) All of the choices are correct.
سؤال
Dealing with patents, copyrights, and licensing for a proposed system is related to _______________ feasibility.

A) economic
B) technical
C) operational
D) legal/political
سؤال
Which of the following is an example of an intangible cost?

A) Employee salaries
B) Loss of customer goodwill
C) Reduced inventory-carrying costs
D) Improved customer service
سؤال
All of the following would be a focus of a human factors feasibility study except:

A) Acceptance by employees
B) How well a proposed system fits the company plans
C) Customer and supplier acceptance
D) All of the choices are factors in human factors feasibility.
سؤال
Fast, automatic calculation of sales totals and shipping costs is an example of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
سؤال
Which of the following statements most accurately applies to the concept of prototyping?

A) Prototyping is not practical for large-scale projects
B) Prototyping produces an actual working model of the information system needed by users
C) Prototyping emphasizes getting the design right the first time
D) Prototyping reduces the need for user involvement in systems development
سؤال
Which of the following statements applies to end user development?

A) IS professionals play a consulting role, while end users do their own application development
B) Focus should be on the fundamental activities of any information system: input, processing, output, storage, and control
C) Users develop new or improved ways to perform your jobs without the direct involvement of IS specialists
D) All of the choices are correct.
سؤال
Prototyping involves:

A) A standard systems development cycle using CASE tools
B) The rapid generation of a system by IS professionals, without the need for end user input
C) An interative, interactive development process with extensive end user involvement
D) A fail-safe development process designed to ensure that an information system meets all user requirements, without revision
سؤال
All of the following would be a focus of a legal/political feasibility study except:

A) Copyright or patent infringements
B) Links to grassroots political parties
C) Identifying the key stakeholders and the degree to which the proposed system may affect the distribution of power
D) Existing contractual obligations
سؤال
In analyzing a potential application, you should focus first on the _______________ to be produced by the application.

A) input
B) processing
C) storage
D) output
سؤال
Which of the following factors is related to technical feasibility?

A) Customer acceptance
B) Governmental restrictions
C) Cost savings
D) Network reliability
سؤال
Which of the following is a function of the systems analysis stage?

A) Conducting a feasibility study
B) Developing the functional requirements of the system
C) Writing program code
D) Data conversion
سؤال
Automatic entry of product data and easy-to-use data entry screens for Web customers are examples of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
سؤال
Which category of feasibility study focuses on determining if reliable hardware and software, capable of meeting the needs of a proposed system, can be acquired or developed in the required time?

A) Economic
B) Operational
C) Technical
D) Legal/political
سؤال
Why are business end users frequently added to system development teams?

A) They have the greatest stake in a successful product
B) They know a lot about the business activities that affect the company's business processes
C) They are usually experienced in IS development
D) They are the most likely to eliminate unnecessary documentation and steps
سؤال
Signals for data entry errors and quick e-mail confirmation for customers are examples of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
سؤال
Economic feasibility is concerned with:

A) How well a proposed information system supports the objectives of the organization and its strategic plan for information systems
B) Whether expected cost savings, increased revenue, increased profits, reductions in required investment, and other types of benefits will exceed the cost of developing and operating a proposed system
C) Determining if reliable hardware and software capable of meeting the needs of a proposed system can be acquired or developed by the business in the required time
D) The willingness and ability of management, employees, customers, suppliers, and others to operate, use, and support a proposed system
سؤال
During the physical design stage, users and analysts focus on determining __________ the system will accomplish its objectives.

A) how
B) when
C) where
D) All of the choices are correct.
سؤال
User interface design refers to the development of:

A) Programs and procedures to be used by end-users
B) Display screens, forms and reports, and interactive computer user dialogs
C) User training manuals
D) The structure of databases and files accessible by end users
سؤال
Which of the following is related to human factors feasibility?

A) Customer acceptance
B) How well the proposed system will fit with the existing organizational structure
C) Increased profits
D) Hardware capability
سؤال
Fast retrieval and update of data from product, pricing, and customer databases is an example of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
سؤال
A logical model of a current system is a blueprint of:

A) How the current system does what it does
B) What the current system does, without regard to how it does it
C) What the system does and how it does it
D) Documentation of what the new system will look like and how it will work
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/141
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Implementing Businessit Solutions
1
Most successful Web sites are built to specifications that satisfy executives, rather than customers or users.
False
2
Microsoft FrontPage is an example of an easy-to-use, end user website development tool.
True
3
Most successful Web sites use complicated color designs so speed of loading the pages is not a concern.
False
4
User interface design is frequently a prototyping process with end user input.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
5
In a logical model, a person's inbox is treated just like a computer hard drive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
6
Many Web sites have their own search engines, but very few are actually useful.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
7
Analyzing the information needs of employees, customers, and other business stakeholders is done during the systems investigation stage of the application development life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
8
Technology has now advanced to the point where a Web site that looks good in one browser on a particular hardware platform will also look great on every other platform and browser.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
9
The danger of a technical feasibility study is finding technology that does not yet exist in a stable form.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
10
By creating a logical model, the various computer hardware components of a system can be incorporated, analyzed, and understood.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
11
Some of the coolest stuff on the Web, such as streaming video, can't be accessed by most Web surfers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
12
There is little that can be learned from studying the system that will be replaced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
13
The most basic protection against accidental lost or damage to end user files is to simply make backup copies on a frequent and systematic basis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
14
"Shadow" IT is a culture where users install "rogue" software or tamper with existing software without the consent of the IT department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
15
Making users fill out long registration forms is a great way to attract users to your Web site because most people enjoy filling out forms and giving out personal information online.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
16
Systems analysts may recycle back at any time during the systems development cycle in order to modify and improve a system under development, but users do not.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
17
Keeping the links updated on a Web page is a very difficult, manual job because there is no software available that can do this for you.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
18
In all cases, a preliminary feasibility assessment is a necessary step.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
19
The application development capabilities built into a variety of software packages have made it easier for many users to develop their own computer-based solutions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
20
Since most Web users today are very competent with technology, most Web sites do not need site maps or need to be easily navigated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
21
Pilot conversion may be the best choice in situations where an automated system is replacing a manual one.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
22
Direct conversion should be considered only in extreme circumstances, where no other conversion strategy is available.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
23
Systems integrators take over complete responsibility for an organization's computer facilities when an organization out-sources its computer operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
24
With a pilot conversion, the old and new systems are run simultaneously until the end users and project coordinators are fully satisfied that the new system is functioning correctly and the old system is no longer necessary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
25
Improperly organized and formatted data are seldom found to be a major contributor to new system implementation failures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
26
These days, evaluating hardware is pretty much limited to speed and pricing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
27
According to the textbook case, IT departments are focusing too much on technology to solve a problem rather than on the problem itself.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
28
A well-designed system can survive an improperly-executed implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
29
The performance of hardware and software can nearly always be determined by obtaining and reading the documentation and case studies supplied by hardware and software suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
30
Unless the operational costs of the new system are significantly less than the old system, the cost of parallel operation can be as much as four times greater than the old system alone.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
31
Every project objective and every activity associated with that objective must be identified and sequenced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
32
Although having the advantage of low risk, the parallel conversion approach also brings with it the highest cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
33
The pilot conversion approach may be required if individual sites or locations have unique characteristics or idiosyncrasies that make a direct or parallel approach unfeasible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
34
Other users are frequently the best source of the information needed to evaluate the claims of manufacturers and suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
35
New systems can be designed to use existing data files, and that is normally the case.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
36
The beginning of the end of a project is the implementation and installation of the project deliverables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
37
The resource allocation report contains information related to the difference between actual and planned project progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
38
Installing a new application may require converting the data elements in databases that are affected by the new application into new formats.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
39
Systems integrators specialize in providing industry-specific hardware, software, and services from selected manufacturers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
40
An RFQ is used as the basis for preparing a proposed purchase agreement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
41
According to the text case, some organizations using PPM simply end projects that go bad.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
42
Determining whether expected cost savings, increased profits, and other benefits exceed the cost of developing and operating a system is related to _______________ feasibility.

A) economic
B) functional
C) operational
D) system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
43
According to the text, certain changes in _______________ may dictate the need for change, regardless of the assessed feasibility of such change.

A) the business environment
B) product specifications
C) management structure
D) technical system requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is done during the systems design stage of application development?

A) Develop logical models of the current system
B) Conduct a feasibility study
C) Develop logical models of new system
D) Convert to the new business system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
45
In a typical organization, more programmers and analysts are assigned to application maintenance activities than to application development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
46
The parallel conversion approach takes the most time and, thus, creates the most disruption to the organization over time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
47
Preventive maintenance activities involve changes to an existing system that are intended to improve the performance of a function or interface.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
48
A feasibility study will answer all of the following questions except:

A) Does the technology exist that is necessary to implement the proposed system?
B) Is the proposed system technologically, economically, and operationally feasible?
C) Which brand and model of computer will be used by the proposed system?
D) What impact will the proposed system have on current employees?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following is done during the systems analysis stage of application development?

A) Develop logical models of the current system
B) Conduct a feasibility study
C) Develop logical models of new system
D) Test the system, and train people to operate and use it
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
50
All of the following are done during the systems implementation stage of application development, except:

A) Develop logical models of the current system
B) Acquire or develop hardware and software
C) Convert to the new business system
D) Manage the effects of system changes on end users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is done during the systems maintenance stage of application development?

A) Develop logical models of the current system
B) Monitor, evaluate, and modify the business system as needed
C) Develop logical models of new system
D) Convert to the new business system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
52
The overall process by which information systems are designed and implemented within organizations is referred to as systems _______________.

A) design
B) analysis
C) analysis and design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
53
Systems thinking means all the following, except:

A) Seeing inter-relationships among systems and processes
B) Seeing processes of change among systems, rather than discrete snapshots of change
C) Seeing linear cause-and-effects when events occur
D) Seeing the forest and the trees in any situation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
54
Managers do not need to be trained on the new system as long as the end users have been trained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
55
All of the following are done during the systems investigation stage of application development, except:

A) Develop logical models of the current system
B) Conduct a feasibility study
C) Determine how to address business opportunities and priorities
D) Develop a project management plan and obtain management approval
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
56
A feasibility study is a preliminary study to investigate the information needs of prospective users and is used to determine the proposed system's _______________.

A) resource requirements
B) costs and benefits
C) feasibility
D) All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
57
The _______________ feasibility assessment focuses on the degree to which the proposed development project fits with the existing business environment and objectives, with regard to development schedule, delivery date, corporate culture, and existing business processes.

A) technical
B) legal/political
C) economic
D) operational
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following correctly reflects the stages of the system development life cycle?

A) Investigation, analysis, implementation, and maintenance
B) Analysis, design, and implementation
C) Investigation, analysis, design, implementation, and maintenance
D) Investigation, prototyping, design, conversion, and change management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
59
Systems thinking means that an individual sees:

A) Inter-relationships among systems and processes
B) Discrete snapshots of change, whenever it occurs
C) Linear cause-and-effects when events occur
D) All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
60
Dealing with patents, copyrights, and licensing for a proposed system is related to _______________ feasibility.

A) economic
B) technical
C) operational
D) legal/political
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
61
Which of the following is an example of an intangible cost?

A) Employee salaries
B) Loss of customer goodwill
C) Reduced inventory-carrying costs
D) Improved customer service
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
62
All of the following would be a focus of a human factors feasibility study except:

A) Acceptance by employees
B) How well a proposed system fits the company plans
C) Customer and supplier acceptance
D) All of the choices are factors in human factors feasibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
63
Fast, automatic calculation of sales totals and shipping costs is an example of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following statements most accurately applies to the concept of prototyping?

A) Prototyping is not practical for large-scale projects
B) Prototyping produces an actual working model of the information system needed by users
C) Prototyping emphasizes getting the design right the first time
D) Prototyping reduces the need for user involvement in systems development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
65
Which of the following statements applies to end user development?

A) IS professionals play a consulting role, while end users do their own application development
B) Focus should be on the fundamental activities of any information system: input, processing, output, storage, and control
C) Users develop new or improved ways to perform your jobs without the direct involvement of IS specialists
D) All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
66
Prototyping involves:

A) A standard systems development cycle using CASE tools
B) The rapid generation of a system by IS professionals, without the need for end user input
C) An interative, interactive development process with extensive end user involvement
D) A fail-safe development process designed to ensure that an information system meets all user requirements, without revision
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
67
All of the following would be a focus of a legal/political feasibility study except:

A) Copyright or patent infringements
B) Links to grassroots political parties
C) Identifying the key stakeholders and the degree to which the proposed system may affect the distribution of power
D) Existing contractual obligations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
68
In analyzing a potential application, you should focus first on the _______________ to be produced by the application.

A) input
B) processing
C) storage
D) output
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which of the following factors is related to technical feasibility?

A) Customer acceptance
B) Governmental restrictions
C) Cost savings
D) Network reliability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
70
Which of the following is a function of the systems analysis stage?

A) Conducting a feasibility study
B) Developing the functional requirements of the system
C) Writing program code
D) Data conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
71
Automatic entry of product data and easy-to-use data entry screens for Web customers are examples of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which category of feasibility study focuses on determining if reliable hardware and software, capable of meeting the needs of a proposed system, can be acquired or developed in the required time?

A) Economic
B) Operational
C) Technical
D) Legal/political
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
73
Why are business end users frequently added to system development teams?

A) They have the greatest stake in a successful product
B) They know a lot about the business activities that affect the company's business processes
C) They are usually experienced in IS development
D) They are the most likely to eliminate unnecessary documentation and steps
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
74
Signals for data entry errors and quick e-mail confirmation for customers are examples of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
75
Economic feasibility is concerned with:

A) How well a proposed information system supports the objectives of the organization and its strategic plan for information systems
B) Whether expected cost savings, increased revenue, increased profits, reductions in required investment, and other types of benefits will exceed the cost of developing and operating a proposed system
C) Determining if reliable hardware and software capable of meeting the needs of a proposed system can be acquired or developed by the business in the required time
D) The willingness and ability of management, employees, customers, suppliers, and others to operate, use, and support a proposed system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
76
During the physical design stage, users and analysts focus on determining __________ the system will accomplish its objectives.

A) how
B) when
C) where
D) All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
77
User interface design refers to the development of:

A) Programs and procedures to be used by end-users
B) Display screens, forms and reports, and interactive computer user dialogs
C) User training manuals
D) The structure of databases and files accessible by end users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which of the following is related to human factors feasibility?

A) Customer acceptance
B) How well the proposed system will fit with the existing organizational structure
C) Increased profits
D) Hardware capability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
79
Fast retrieval and update of data from product, pricing, and customer databases is an example of a _______________ requirement.

A) user interface
B) processing
C) control
D) storage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
80
A logical model of a current system is a blueprint of:

A) How the current system does what it does
B) What the current system does, without regard to how it does it
C) What the system does and how it does it
D) Documentation of what the new system will look like and how it will work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 141 في هذه المجموعة.