Deck 4: Activity-Based Costing and Analysis

ملء الشاشة (f)
exit full mode
سؤال
The plantwide overhead rate is total plantwide allocation base divided by total budgeted plantwide overhead cost.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The departmental overhead rate method uses a different overhead rate for each production department.
سؤال
The activity-based costing method uses volume-based measures to allocate overhead costs.
سؤال
The plantwide overhead rate is determined using volume-related measures.
سؤال
By definition, costs classified as overhead are consumed in basically the same manner regardless of the process involved.
سؤال
Data concerning volume-related measures are readily available in most manufacturing settings.
سؤال
The cost to heat a manufacturing facility can be directly linked to the number of units produced.
سؤال
Departments are the cost objects when the plantwide overhead rate method is used.
سؤال
The departmental overhead rate method allows each department to have its own overhead rate and its own allocation base.
سؤال
Overhead costs are not directly related to production and cannot be traced to units of product like direct materials and direct labor can.
سؤال
The unit of product is the cost object when the plantwide overhead rate method is used.
سؤال
Examples of volume-related measures include direct labor hours and machine hours.
سؤال
Products are the first stage cost objects when using a departmental overhead rate method.
سؤال
Product costs consist of direct labor, direct materials, and overhead (indirect) costs.
سؤال
Distorted product cost information can result in poor decisions.
سؤال
The departmental overhead rate method uses the same overhead rate for each production department.
سؤال
The departmental overhead rate method involves the following four steps: 1) Assign overhead costs to departmental cost pools, 2) select an allocation base for each department, 3) compute overhead allocation rates for each department, and 4) use departmental overhead rates to assign overhead costs to products.
سؤال
Activities are the cost objects of the second stage of ABC.
سؤال
Overhead costs are indirect costs so assigning these costs to products requires an allocation method.
سؤال
The premise of ABC is that it takes activities to make products and provide services and these activities drive costs.
سؤال
Compared to the plantwide overhead rate method, the departmental overhead rate method usually results in more accurate overhead allocations.
سؤال
Multiple cost pools are used when allocating overhead using the plantwide overhead rate method.
سؤال
When products differ in batch size and complexity, they usually consume different amounts of overhead resources.
سؤال
Allocated overhead costs vary depending upon the allocation methods used.
سؤال
A major disadvantage of using a plantwide overhead rate is the extreme difficulty in gathering the needed information.
سؤال
The use of a plantwide overhead rate is not acceptable for external reporting under GAAP.
سؤال
Some companies allocate their overhead cost using a plantwide overhead rate largely because of its simplicity.
سؤال
The usefulness of overhead allocations based on a plantwide overhead rate depends on two crucial assumptions: (1) the overhead cost is correlated with the allocation base; and (2) all products use overhead cost in dissimilar proportions.
سؤال
Because departmental overhead costs are allocated based on measures closely related to production volume, they accurately assign overhead, such as utility costs.
سؤال
The usefulness of overhead allocations based on a plantwide overhead rate depends on two crucial assumptions: (1) the overhead cost is correlated with the allocation base; and (2) all products use overhead cost in similar proportions.
سؤال
A single cost pool is used when allocating overhead using the activity-based costing method.
سؤال
ABC is significantly less costly to implement and maintain than more traditional overhead costing systems.
سؤال
ABC allocates overhead costs to products based on activities rather than direct labor or machine hours.
سؤال
ABC can be used to assign costs to any cost object that is of management interest.
سؤال
A cost pool is a collection of costs that are related to the same or similar activity.
سؤال
Activities are the cost objects of the first stage of ABC.
سؤال
Compared to the departmental overhead rate method, the plantwide overhead rate method usually results in more accurate overhead allocations.
سؤال
Activity-based costing first assigns costs to products and then uses these product costs to assign costs to manufacturing activities.
سؤال
Management's pricing and cost decisions for a product are influenced by that product's cost assignments.
سؤال
Overhead costs are often affected by many issues and are frequently too complex to be explained by any one factor.
سؤال
ABC is more costly to implement and maintain than more traditional overhead costing systems.
سؤال
A company produces computer chips that go through two departments, department A1 and department B2, before they are complete. Expected costs and activities for the two departments are shown below. Departmental overhead rates are based on machine hours in department A1 and direct labor hours in department B2. Therefore, the overhead rates for department A1 and department B2 are $3.62 per machine hour and $5.73 per direct labor hour, respectively.
A company produces computer chips that go through two departments, department A1 and department B2, before they are complete. Expected costs and activities for the two departments are shown below. Departmental overhead rates are based on machine hours in department A1 and direct labor hours in department B2. Therefore, the overhead rates for department A1 and department B2 are $3.62 per machine hour and $5.73 per direct labor hour, respectively.  <div style=padding-top: 35px>
سؤال
A company produces paint that goes through two operations, operation A and operation B, before it is complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for Department B based on machine hours is $4 per machine hour.
A company produces paint that goes through two operations, operation A and operation B, before it is complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for Department B based on machine hours is $4 per machine hour.  <div style=padding-top: 35px>
سؤال
Kinetic Company estimates that overhead costs for the next year will be $1,600,000 for indirect labor and $400,000 for factory utilities. The company uses direct labor hours as its overhead allocation base. If 50,000 direct labor hours are planned for this next year, then the plantwide overhead rate is $.025 per direct labor hour.
سؤال
If the direct labor time estimates are met, Malone will allocate $12.59 of overhead cost to each unit of Little X.
سؤال
Activity-based costing involves four steps: (1) identify activities and the costs they cause, (2) group similar activities into cost pools, (3) determine an activity rate for each activity cost pool, and (4) allocate overhead costs to products using those activity rates.
سؤال
Kinetic Company estimates that overhead costs for the next year will be $1,600,000 for indirect labor and $400,000 for factory utilities. The company uses direct labor hours as its overhead allocation base, and plans to use 50,000 direct labor hours for this next year. If a product uses 5 direct labor hours, then it will be assigned $200 in overhead costs.
سؤال
A company produces surgical equipment that goes through three departments, 1A1, 2B2, and 3C3, before they are complete. Expected costs and activities for the three departments are shown below. All departments have departmental overhead rates based on direct labor hours. Therefore, the overhead rate for each department is $5 per direct labor hour.
A company produces surgical equipment that goes through three departments, 1A1, 2B2, and 3C3, before they are complete. Expected costs and activities for the three departments are shown below. All departments have departmental overhead rates based on direct labor hours. Therefore, the overhead rate for each department is $5 per direct labor hour.  <div style=padding-top: 35px>
سؤال
When using the plantwide overhead rate method, total budgeted overhead costs are combined into one overhead cost pool.
سؤال
A company estimates that costs for the next year will be $500,000 for indirect labor, $50,000 for factory utilities, and $1,000,000 for the CEO's salary. The company uses machine hours as its overhead allocation base. If 25,000 machine hours are planned for this next year, then a product requiring 10 machine hours will be assigned $220 in overhead.
سؤال
[The following information applies to the questions displayed below.]
Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.
[The following information applies to the questions displayed below.] Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.   Malone has 33,000 total estimated direct labor hours for next year.<div style=padding-top: 35px>
Malone has 33,000 total estimated direct labor hours for next year.
سؤال
Turtle Company produces t-shirts that go through two operations, cutting and sewing, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the cutting department based on direct labor hours is $2.69 per direct labor hour (rounded to two decimals).
Turtle Company produces t-shirts that go through two operations, cutting and sewing, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the cutting department based on direct labor hours is $2.69 per direct labor hour (rounded to two decimals).  <div style=padding-top: 35px>
سؤال
A company produces heating elements that go through two operations, casting and assembling, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the assembling department based on direct labor hours is $5 per direct labor hour.
A company produces heating elements that go through two operations, casting and assembling, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the assembling department based on direct labor hours is $5 per direct labor hour.  <div style=padding-top: 35px>
سؤال
A company estimates that costs for the next year will be $500,000 for indirect labor, $50,000 for factory utilities, and $1,000,000 for the CEO's salary. The company uses machine hours as its overhead allocation base. If 25,000 machine hours are planned for this next year, then the plantwide overhead rate is $22 per machine hour.
سؤال
The first step in using the departmental overhead rate method requires that overhead be traced to each of the company's departments.
سؤال
A company produces garden benches that go through two departments, department 1A1 and department 2B2, before they are complete. Expected costs and activities for the two departments are shown below. Both departments have departmental overhead rates based on machine hours. Therefore, the overhead rates for department 1A1 and department 2B2 are the same.
A company produces garden benches that go through two departments, department 1A1 and department 2B2, before they are complete. Expected costs and activities for the two departments are shown below. Both departments have departmental overhead rates based on machine hours. Therefore, the overhead rates for department 1A1 and department 2B2 are the same.  <div style=padding-top: 35px>
سؤال
The departmental overhead rate method traces costs to each department and then determines an allocation base for each department.
سؤال
A company estimates total overhead costs for the next year to be $1,200,000 and wishes to use direct labor hours as its overhead allocation base. This company makes two products: (1) Fancy X, which requires three direct labor hours per unit, and (2) Plain X, which requires one direct labor hour per unit. If the company plans to make 10,000 units of Fancy X and 10,000 units of Plain X, then each unit produced will be allocated the same amount of overhead.
سؤال
[The following information applies to the questions displayed below.]
Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.
[The following information applies to the questions displayed below.] Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.   Malone's plantwide overhead rate will be $20.99 per direct labor hour next year.<div style=padding-top: 35px>
Malone's plantwide overhead rate will be $20.99 per direct labor hour next year.
سؤال
The more activities tracked by activity-based costing, the more accurately overhead costs are assigned.
سؤال
Facility-level costs are not traceable to individual product lines, batches or units.
سؤال
Two big benefits of ABC costing are a) more accurate product cost information and b) more detailed information on costs and the drivers of those costs.
سؤال
Unit-level costs vary with the number of units produced.
سؤال
Batch-level costs vary with the number of units produced.
سؤال
Activity-based costing often shifts overhead costs from large volume, standardized products to low-volume, specialty products that consume disproportionate resources.
سؤال
Which of the following would not be considered a product cost?

A) Direct labor costs.
B) Factory supervisor's salary.
C) Factory line worker's salary.
D) Cost accountant's salary.
E) Manufacturing overhead costs.
سؤال
A quality-inspection cost is an example of unit-level costs.
سؤال
Overhead costs:

A) Are directly related to production.
B) Can be traced to units of product in the same way that direct materials can.
C) Cannot be traced to units of product in the same way that direct labor can.
D) Are period costs.
E) Include only fixed costs.
سؤال
Which types of overhead allocation methods result in the use of more than one overhead rate during the same time period?

A) Plantwide overhead rate method and departmental overhead rate method.
B) Cost pool overhead rate method and plantwide overhead rate method.
C) Departmental overhead rate method and activity-based costing.
D) Activity-based costing and plantwide overhead rate method.
E) Departmental overhead rate method and cost pool overhead rate method.
سؤال
Product-level costs do not vary with the number of units or batches produced.
سؤال
A method of assigning overhead costs to a product using a single overhead rate is:

A) Plantwide overhead rate method.
B) Cost pool overhead rate method.
C) Departmental overhead rate method.
D) Activity-based costing.
E) Overhead cost allocation method.
سؤال
Product design costs are an example of a unit level activity.
سؤال
Activities causing overhead cost in an organization are typically separated into four levels: (1) direct activities, (2) indirect activities, (3) batch level activities, and (4) facility level activities.
سؤال
Activity-based costing eliminates the need for overhead allocation rates.
سؤال
Plantwide overhead rates typically do a better job of matching each department's overhead costs to the products using the department's resources than do departmental overhead rates.
سؤال
Facility-level costs vary with the number of units or batches produced.
سؤال
Machine setup costs are an example of a batch level activity.
سؤال
Batch-level costs do not vary with the number of units produced.
سؤال
In activity-based costing, an activity can involve several related tasks.
سؤال
The final step of activity-based costing assigns overhead costs to pools rather than to products.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/223
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Activity-Based Costing and Analysis
1
The plantwide overhead rate is total plantwide allocation base divided by total budgeted plantwide overhead cost.
False
2
The departmental overhead rate method uses a different overhead rate for each production department.
True
3
The activity-based costing method uses volume-based measures to allocate overhead costs.
False
4
The plantwide overhead rate is determined using volume-related measures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
5
By definition, costs classified as overhead are consumed in basically the same manner regardless of the process involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
6
Data concerning volume-related measures are readily available in most manufacturing settings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
7
The cost to heat a manufacturing facility can be directly linked to the number of units produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
8
Departments are the cost objects when the plantwide overhead rate method is used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
9
The departmental overhead rate method allows each department to have its own overhead rate and its own allocation base.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
10
Overhead costs are not directly related to production and cannot be traced to units of product like direct materials and direct labor can.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
11
The unit of product is the cost object when the plantwide overhead rate method is used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
12
Examples of volume-related measures include direct labor hours and machine hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
13
Products are the first stage cost objects when using a departmental overhead rate method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
14
Product costs consist of direct labor, direct materials, and overhead (indirect) costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
15
Distorted product cost information can result in poor decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
16
The departmental overhead rate method uses the same overhead rate for each production department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
17
The departmental overhead rate method involves the following four steps: 1) Assign overhead costs to departmental cost pools, 2) select an allocation base for each department, 3) compute overhead allocation rates for each department, and 4) use departmental overhead rates to assign overhead costs to products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
18
Activities are the cost objects of the second stage of ABC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
19
Overhead costs are indirect costs so assigning these costs to products requires an allocation method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
20
The premise of ABC is that it takes activities to make products and provide services and these activities drive costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
21
Compared to the plantwide overhead rate method, the departmental overhead rate method usually results in more accurate overhead allocations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
22
Multiple cost pools are used when allocating overhead using the plantwide overhead rate method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
23
When products differ in batch size and complexity, they usually consume different amounts of overhead resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
24
Allocated overhead costs vary depending upon the allocation methods used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
25
A major disadvantage of using a plantwide overhead rate is the extreme difficulty in gathering the needed information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
26
The use of a plantwide overhead rate is not acceptable for external reporting under GAAP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
27
Some companies allocate their overhead cost using a plantwide overhead rate largely because of its simplicity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
28
The usefulness of overhead allocations based on a plantwide overhead rate depends on two crucial assumptions: (1) the overhead cost is correlated with the allocation base; and (2) all products use overhead cost in dissimilar proportions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
29
Because departmental overhead costs are allocated based on measures closely related to production volume, they accurately assign overhead, such as utility costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
30
The usefulness of overhead allocations based on a plantwide overhead rate depends on two crucial assumptions: (1) the overhead cost is correlated with the allocation base; and (2) all products use overhead cost in similar proportions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
31
A single cost pool is used when allocating overhead using the activity-based costing method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
32
ABC is significantly less costly to implement and maintain than more traditional overhead costing systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
33
ABC allocates overhead costs to products based on activities rather than direct labor or machine hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
34
ABC can be used to assign costs to any cost object that is of management interest.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
35
A cost pool is a collection of costs that are related to the same or similar activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
36
Activities are the cost objects of the first stage of ABC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
37
Compared to the departmental overhead rate method, the plantwide overhead rate method usually results in more accurate overhead allocations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
38
Activity-based costing first assigns costs to products and then uses these product costs to assign costs to manufacturing activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
39
Management's pricing and cost decisions for a product are influenced by that product's cost assignments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
40
Overhead costs are often affected by many issues and are frequently too complex to be explained by any one factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
41
ABC is more costly to implement and maintain than more traditional overhead costing systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
42
A company produces computer chips that go through two departments, department A1 and department B2, before they are complete. Expected costs and activities for the two departments are shown below. Departmental overhead rates are based on machine hours in department A1 and direct labor hours in department B2. Therefore, the overhead rates for department A1 and department B2 are $3.62 per machine hour and $5.73 per direct labor hour, respectively.
A company produces computer chips that go through two departments, department A1 and department B2, before they are complete. Expected costs and activities for the two departments are shown below. Departmental overhead rates are based on machine hours in department A1 and direct labor hours in department B2. Therefore, the overhead rates for department A1 and department B2 are $3.62 per machine hour and $5.73 per direct labor hour, respectively.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
43
A company produces paint that goes through two operations, operation A and operation B, before it is complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for Department B based on machine hours is $4 per machine hour.
A company produces paint that goes through two operations, operation A and operation B, before it is complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for Department B based on machine hours is $4 per machine hour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
44
Kinetic Company estimates that overhead costs for the next year will be $1,600,000 for indirect labor and $400,000 for factory utilities. The company uses direct labor hours as its overhead allocation base. If 50,000 direct labor hours are planned for this next year, then the plantwide overhead rate is $.025 per direct labor hour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
45
If the direct labor time estimates are met, Malone will allocate $12.59 of overhead cost to each unit of Little X.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
46
Activity-based costing involves four steps: (1) identify activities and the costs they cause, (2) group similar activities into cost pools, (3) determine an activity rate for each activity cost pool, and (4) allocate overhead costs to products using those activity rates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
47
Kinetic Company estimates that overhead costs for the next year will be $1,600,000 for indirect labor and $400,000 for factory utilities. The company uses direct labor hours as its overhead allocation base, and plans to use 50,000 direct labor hours for this next year. If a product uses 5 direct labor hours, then it will be assigned $200 in overhead costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
48
A company produces surgical equipment that goes through three departments, 1A1, 2B2, and 3C3, before they are complete. Expected costs and activities for the three departments are shown below. All departments have departmental overhead rates based on direct labor hours. Therefore, the overhead rate for each department is $5 per direct labor hour.
A company produces surgical equipment that goes through three departments, 1A1, 2B2, and 3C3, before they are complete. Expected costs and activities for the three departments are shown below. All departments have departmental overhead rates based on direct labor hours. Therefore, the overhead rate for each department is $5 per direct labor hour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
49
When using the plantwide overhead rate method, total budgeted overhead costs are combined into one overhead cost pool.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
50
A company estimates that costs for the next year will be $500,000 for indirect labor, $50,000 for factory utilities, and $1,000,000 for the CEO's salary. The company uses machine hours as its overhead allocation base. If 25,000 machine hours are planned for this next year, then a product requiring 10 machine hours will be assigned $220 in overhead.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
51
[The following information applies to the questions displayed below.]
Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.
[The following information applies to the questions displayed below.] Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.   Malone has 33,000 total estimated direct labor hours for next year.
Malone has 33,000 total estimated direct labor hours for next year.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
52
Turtle Company produces t-shirts that go through two operations, cutting and sewing, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the cutting department based on direct labor hours is $2.69 per direct labor hour (rounded to two decimals).
Turtle Company produces t-shirts that go through two operations, cutting and sewing, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the cutting department based on direct labor hours is $2.69 per direct labor hour (rounded to two decimals).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
53
A company produces heating elements that go through two operations, casting and assembling, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the assembling department based on direct labor hours is $5 per direct labor hour.
A company produces heating elements that go through two operations, casting and assembling, before they are complete. Expected costs and activities for the two departments are shown below. Given this information, the departmental overhead rate for the assembling department based on direct labor hours is $5 per direct labor hour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
54
A company estimates that costs for the next year will be $500,000 for indirect labor, $50,000 for factory utilities, and $1,000,000 for the CEO's salary. The company uses machine hours as its overhead allocation base. If 25,000 machine hours are planned for this next year, then the plantwide overhead rate is $22 per machine hour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
55
The first step in using the departmental overhead rate method requires that overhead be traced to each of the company's departments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
56
A company produces garden benches that go through two departments, department 1A1 and department 2B2, before they are complete. Expected costs and activities for the two departments are shown below. Both departments have departmental overhead rates based on machine hours. Therefore, the overhead rates for department 1A1 and department 2B2 are the same.
A company produces garden benches that go through two departments, department 1A1 and department 2B2, before they are complete. Expected costs and activities for the two departments are shown below. Both departments have departmental overhead rates based on machine hours. Therefore, the overhead rates for department 1A1 and department 2B2 are the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
57
The departmental overhead rate method traces costs to each department and then determines an allocation base for each department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
58
A company estimates total overhead costs for the next year to be $1,200,000 and wishes to use direct labor hours as its overhead allocation base. This company makes two products: (1) Fancy X, which requires three direct labor hours per unit, and (2) Plain X, which requires one direct labor hour per unit. If the company plans to make 10,000 units of Fancy X and 10,000 units of Plain X, then each unit produced will be allocated the same amount of overhead.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
59
[The following information applies to the questions displayed below.]
Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.
[The following information applies to the questions displayed below.] Malone Company sells two products Big X and Little X. Current direct material and direct labor costs are detailed below. Next year, the company wishes to use a plantwide overhead rate with direct labor hours as its allocation base. Next year's overhead is estimated to be $510,000. The direct labor and direct materials costs are estimated to be consistent with the current year. Direct labor costs $20 per hour and the company expects to manufacture 15,000 units of Big X and 18,000 units of Little X next year.   Malone's plantwide overhead rate will be $20.99 per direct labor hour next year.
Malone's plantwide overhead rate will be $20.99 per direct labor hour next year.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
60
The more activities tracked by activity-based costing, the more accurately overhead costs are assigned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
61
Facility-level costs are not traceable to individual product lines, batches or units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
62
Two big benefits of ABC costing are a) more accurate product cost information and b) more detailed information on costs and the drivers of those costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
63
Unit-level costs vary with the number of units produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
64
Batch-level costs vary with the number of units produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
65
Activity-based costing often shifts overhead costs from large volume, standardized products to low-volume, specialty products that consume disproportionate resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following would not be considered a product cost?

A) Direct labor costs.
B) Factory supervisor's salary.
C) Factory line worker's salary.
D) Cost accountant's salary.
E) Manufacturing overhead costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
67
A quality-inspection cost is an example of unit-level costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
68
Overhead costs:

A) Are directly related to production.
B) Can be traced to units of product in the same way that direct materials can.
C) Cannot be traced to units of product in the same way that direct labor can.
D) Are period costs.
E) Include only fixed costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which types of overhead allocation methods result in the use of more than one overhead rate during the same time period?

A) Plantwide overhead rate method and departmental overhead rate method.
B) Cost pool overhead rate method and plantwide overhead rate method.
C) Departmental overhead rate method and activity-based costing.
D) Activity-based costing and plantwide overhead rate method.
E) Departmental overhead rate method and cost pool overhead rate method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
70
Product-level costs do not vary with the number of units or batches produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
71
A method of assigning overhead costs to a product using a single overhead rate is:

A) Plantwide overhead rate method.
B) Cost pool overhead rate method.
C) Departmental overhead rate method.
D) Activity-based costing.
E) Overhead cost allocation method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
72
Product design costs are an example of a unit level activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
73
Activities causing overhead cost in an organization are typically separated into four levels: (1) direct activities, (2) indirect activities, (3) batch level activities, and (4) facility level activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
74
Activity-based costing eliminates the need for overhead allocation rates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
75
Plantwide overhead rates typically do a better job of matching each department's overhead costs to the products using the department's resources than do departmental overhead rates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
76
Facility-level costs vary with the number of units or batches produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
77
Machine setup costs are an example of a batch level activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
78
Batch-level costs do not vary with the number of units produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
79
In activity-based costing, an activity can involve several related tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
80
The final step of activity-based costing assigns overhead costs to pools rather than to products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 223 في هذه المجموعة.